(Created page with "Present: ==Agenda== * Where are we now? * Cryo hardware status * Gas system status ** Exhaust from pressure relief ** Plumbing on cart ** pressure system documentation ** Stor...") |
(→Agenda) |
||
Line 26: | Line 26: | ||
** thermometry | ** thermometry | ||
** Spare cell | ** Spare cell | ||
− | * Readiness review? | + | * Schedule |
+ | ** Readiness review? | ||
+ | ** Assy/test in EEL | ||
+ | ** Install/test in Hall | ||
=Info== | =Info== |
Revision as of 08:11, 26 March 2014
Present:
Contents
Agenda
- Where are we now?
- Cryo hardware status
- Gas system status
- Exhaust from pressure relief
- Plumbing on cart
- pressure system documentation
- Storage tanks
- 3D model/drawings
- Target/Start counter interface
- Vacuum system update
- Flange config
- Controls status
- updated P&I
- changes for subcooled config
- Installation cart update
- Tank config
- Lifting
- Controls/panel config
- Alignment features
- Scattering chamber status
- Cell Status
- Straight torlon entrance tube
- thermometry
- Spare cell
- Schedule
- Readiness review?
- Assy/test in EEL
- Install/test in Hall
Info=
- P&I Diagram Media:Target P&I.pdf
- Controls logic Media:Target controls.pdf
- Dave's SOW Media:Target new SOW.pdf
- Dave's Calcs Media:Target calcs1.pdf Media:Target calcs2.pdf
- Dave's FMEA Media:Target latest FMEA.pdf