Difference between revisions of "GlueX Target Design Mtg, Mar 26, 2014"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 31: Line 31:
 
** Install/test in Hall
 
** Install/test in Hall
  
=Info==
+
=Info=
 
*P&I Diagram [[Media:Target P&I.pdf]]
 
*P&I Diagram [[Media:Target P&I.pdf]]
 
*Controls logic [[Media:Target controls.pdf]]
 
*Controls logic [[Media:Target controls.pdf]]

Revision as of 08:12, 26 March 2014

Present:

Agenda

  • Where are we now?
  • Cryo hardware status
  • Gas system status
    • Exhaust from pressure relief
    • Plumbing on cart
    • pressure system documentation
    • Storage tanks
  • 3D model/drawings
  • Target/Start counter interface
  • Vacuum system update
    • Flange config
  • Controls status
    • updated P&I
    • changes for subcooled config
  • Installation cart update
    • Tank config
    • Lifting
    • Controls/panel config
    • Alignment features
  • Scattering chamber status
  • Cell Status
    • Straight torlon entrance tube
    • thermometry
    • Spare cell
  • Schedule
    • Readiness review?
    • Assy/test in EEL
    • Install/test in Hall

Info


Minutes

Action Items