GlueX Target Design Mtg, Mar 26, 2014

From GlueXWiki
Revision as of 08:10, 26 March 2014 by Whitey (Talk | contribs) (Created page with "Present: ==Agenda== * Where are we now? * Cryo hardware status * Gas system status ** Exhaust from pressure relief ** Plumbing on cart ** pressure system documentation ** Stor...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Present:

Agenda

  • Where are we now?
  • Cryo hardware status
  • Gas system status
    • Exhaust from pressure relief
    • Plumbing on cart
    • pressure system documentation
    • Storage tanks
  • 3D model/drawings
  • Target/Start counter interface
  • Vacuum system update
    • Flange config
  • Controls status
    • updated P&I
    • changes for subcooled config
  • Installation cart update
    • Tank config
    • Lifting
    • Controls/panel config
    • Alignment features
  • Scattering chamber status
  • Cell Status
    • Straight torlon entrance tube
    • thermometry
    • Spare cell
  • Readiness review?

Info=


Minutes

Action Items