Difference between revisions of "GlueX Target Design Mtg, March 8, 2013"

From GlueXWiki
Jump to: navigation, search
(Created page with "Present: Dave Meekins, Jim Fochtman, Mark Ito, Chris Keith, Tim Whitlatch, James Brock, Josh Pierce, Josh Ballard, Dave Butler ==Agenda== *P&I Diagram [[Media:Latest Target P&I...")
 
(Notes from last week)
 
Line 32: Line 32:
 
** Still need to develop heat shield and work out cold head weight limits
 
** Still need to develop heat shield and work out cold head weight limits
 
** Written procedure needed
 
** Written procedure needed
** Heium and Neon were condensed in
+
** Heium and Neon were condensed in a production target.
 +
*** Helium took approx. 10 hrs
 +
*** Neon took approx. 3 hrs
 +
** Discussion on using a heater on the cell return to help convection and one on the supply line to quicken boil off (warm up). Target group will try another run with heaters.
 +
** If heaters used, need controls
 +
** Plan on internal review this June
 +
** Discussion on using aluminum instead of torlon for base of cell. Jim to talk to Steve Christo.
 +
** Need to finalize infrastructure schedule and drawings
 +
** Hall D personnel will install piping in hall and to tank.
 +
** Target group to supply break out box for controls interface
 +
** Dave M. to get P&I to Dave Butler for controls loop
 +
** Discussion to use relays to shut down compressor, vacuum valves and heaters.
 +
** All need to read Dave M. SOW and comment back to him.

Latest revision as of 09:09, 8 March 2013

Present: Dave Meekins, Jim Fochtman, Mark Ito, Chris Keith, Tim Whitlatch, James Brock, Josh Pierce, Josh Ballard, Dave Butler

Agenda

  • Review notes from last week
  • Review Dave's SOW

New action Items

Notes from last week

  • Discussed Gas system status, vacuum system, cell and scattering chamber and tasks to be done. The following are the results of the discussion;
    • Procurement of gas system components started. Still need piping and relief valves. $40-50K
    • Maybe best to locate purge bottle on pad outside hall?
    • Target group will order the 500 gallon H2 tank for outside and take care of piping and instrumentation on the tank - off-shelf item, order in May/June
    • Jim Fochtman working on the pad requirements for the tank and purge system as well as path of piping to hall and submit to facilities for installation.
    • Probably locate pipes to tank through cryo penetrations.
    • Plan to use 20' flex line to allow target to be moved in and out of the detector
    • lakeshore controller from target group was tested for compatibility with Hall D controls. All is good. Chris ordered controller and Josh ordered PLC controls. Still need to order cables.
    • Looks like a heat exchanger using LCW/Chilled water most economical for refrig. compressor
    • Jim to get with Dave on scattering chamber design (<15Psig).
    • Tim ordered vacuum system pump cube (Pfeifer turbo cube). Still need to order gauging.
    • Chris sent out list of all items needed for monitoring/controlling from PLC system
    • Hall D people to discuss what needs to be shut off in hall when target vacuum goes south
    • Jim to develop H2 vent details
    • One target cell is made, will need to make two more
    • Dave to handle pressure system design as the DA
    • Still need to develop heat shield and work out cold head weight limits
    • Written procedure needed
    • Heium and Neon were condensed in a production target.
      • Helium took approx. 10 hrs
      • Neon took approx. 3 hrs
    • Discussion on using a heater on the cell return to help convection and one on the supply line to quicken boil off (warm up). Target group will try another run with heaters.
    • If heaters used, need controls
    • Plan on internal review this June
    • Discussion on using aluminum instead of torlon for base of cell. Jim to talk to Steve Christo.
    • Need to finalize infrastructure schedule and drawings
    • Hall D personnel will install piping in hall and to tank.
    • Target group to supply break out box for controls interface
    • Dave M. to get P&I to Dave Butler for controls loop
    • Discussion to use relays to shut down compressor, vacuum valves and heaters.
    • All need to read Dave M. SOW and comment back to him.