Difference between revisions of "GlueX Target Meeting, June 24, 2014"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 5: Line 5:
 
==Agenda==
 
==Agenda==
 
* Schedule
 
* Schedule
** Readiness review [[Media:Target Review.pdf]]
 
 
** Assy/test in EEL
 
** Assy/test in EEL
 +
** Readiness review [[Media:Target Review.pdf]]
 
** Install/test in Hall* Where are we now? [[Media:Target labor.pdf]]
 
** Install/test in Hall* Where are we now? [[Media:Target labor.pdf]]
 
* Gas system status
 
* Gas system status
Line 25: Line 25:
 
** thermometry
 
** thermometry
 
** Spare cell
 
** Spare cell
 
  
 
=Info=
 
=Info=

Revision as of 12:25, 24 June 2014

Present: Chris Keith, Josh Pierce, James Brock, Matt Marchlik, Dave Butler, Alexandre Deur, Tim Whitlatch

Minutes from last mtg https://halldweb1.jlab.org/wiki/index.php/GlueX_Target_Design_Mtg,_April_21,_2014

Agenda

  • Schedule
  • Gas system status
    • Exhaust from pressure relief
    • Plumbing on cart
    • pressure system documentation
    • Storage tanks
  • 3D model/drawings Media:Target assy.pdf
  • Vacuum system
  • Controls status
    • updated P&I
    • changes for subcooled config
  • Cart mods
    • Controls/panel config
    • Alignment
  • Scattering chamber status
  • Cell Fabrication Status
    • thermometry
    • Spare cell

Info


Minutes