== Date and Time ==
 
== Date and Time ==
June 11, 2013
+
1:00 pm, June 11, 2013, room F326
  
 
== Video Connection information if needed ==
 
== Video Connection information if needed ==
Line 14: Line 14:
 
* Franz Klein (Professor of Physics)  
 
* Franz Klein (Professor of Physics)  
  
=== JLab ===  
+
=== JLab reviewers ===  
 
* Fernando Barbosa (Hall D eletrical engineer)
 
* Fernando Barbosa (Hall D eletrical engineer)
 
* Eugene Chudakov (Hall D group leader)
 
* Eugene Chudakov (Hall D group leader)
 
* William Crahen (Hall D engineer)
 
* William Crahen (Hall D engineer)
* Bruce Lenzer (JLab ESH&Q)
+
* Glenn Young (Associate Project Manager for Physics)
 
* Mark Ito (Hall D Staff)  
 
* Mark Ito (Hall D Staff)  
 +
* Bruce Lenzer (JLab ESH&Q)
 +
* Vladimir Popov (JLab, ESH)
 
* Elton Smith (Hall D Staff)
 
* Elton Smith (Hall D Staff)
 
* Alexander Somov (Hall D Staff, SOTR)
 
* Alexander Somov (Hall D Staff, SOTR)
Line 32: Line 34:
  
 
== Meeting Agenda ==
 
== Meeting Agenda ==
* 13:00  Overview of the Construction Facilities at CUA.
+
* 13:00  [https://userweb.jlab.org/~fklein/Construction%20Facilities%20at%20CUA.pdf Overview of the Construction Facilities at CUA]
 
+
* 13:30 Project Overview
+
* 13:30 [https://userweb.jlab.org/~fklein/Broadband_Hodoscope_June2013.pdf Project Overview]
 
** Scope of contract and current review
 
** Scope of contract and current review
 
** Status of construction
 
** Status of construction
* 14:00 Review of the construction procedures and corresponding Technical Documents
+
* 14:00 Review construction procedures
 
*;<ins> Work performed at CUA </ins>
 
*;<ins> Work performed at CUA </ins>
 
** Inspection (measurement) of scintillators and light guides. Parameters recording.
 
** Inspection (measurement) of scintillators and light guides. Parameters recording.
Line 45: Line 47:
 
*;<ins> Work performed at JLab </ins>
 
*;<ins> Work performed at JLab </ins>
 
** Checking PMTs and electronics  
 
** Checking PMTs and electronics  
** Overview counter's mounting frame and procedures
+
** [https://www.jlab.org/Hall-D/gluex_secure/reviews/readiness_CUA/Hall_D_Tagger_Fixed_array_readiness_review.pptx    Overview counter's mounting frame and procedures]
 
** Fixture to mount light guides on the support collar
 
** Fixture to mount light guides on the support collar
** Mounting counters on the frame (alignment check)
+
** Gluing PMTs to light guides (gluing fixture, joint inspection).
** Gluing PMTs to light guides. Joint inspection.
+
** Mounting counters on the support frame (position and alignment checks)
 
** Final counter fabrication (housing, connectors ...)
 
** Final counter fabrication (housing, connectors ...)
** Final bench tests (HV, check with cosmics )
+
** Final bench tests (HV, electronics)
 
*;<ins> Installation of counter frames in the Hall </ins>
 
*;<ins> Installation of counter frames in the Hall </ins>
** Final Construction Plan and Facilities
+
** Installation procedures
 +
** Final Tests
 +
 
 +
* Review Technical Documents
 +
** Construction Plan
 
** Testing procedures
 
** Testing procedures
 
** Quality Assurance Plans and Acceptance Test Plans
 
** Quality Assurance Plans and Acceptance Test Plans
Line 69: Line 75:
  
 
[https://www.jlab.org/Hall-D/gluex_secure/reviews/readiness_CUA/Tagger-fixed-array-QA_Plan.doc Quality Assurance and Acceptance Test Plan]
 
[https://www.jlab.org/Hall-D/gluex_secure/reviews/readiness_CUA/Tagger-fixed-array-QA_Plan.doc Quality Assurance and Acceptance Test Plan]
 +
 +
[https://www.jlab.org/Hall-D/gluex_secure/reviews/readiness_CUA/SOW_CUA_D00000-19-01-S001Rev--7.pdf Statement of Work]
 +
 +
[https://userweb.jlab.org/~fklein/TAGH_personnel_training.pdf Personnel Training]
 +
 +
[https://www.jlab.org/Hall-D/gluex_secure/reviews/readiness_CUA/CU_Hodoscope_Readiness_Review_QA_Checklist_V1.xls Quality Assurance Checklist ]

Latest revision as of 12:00, 11 June 2013

Date and Time

1:00 pm, June 11, 2013, room F326

Video Connection information if needed

JLab Conference Room L102

  • ESNET and EVO session
  • Phone only if requested:
    • +1-866-740-1260 : US
    • access code: 3421244# (remember the "#"). Phone line by request only.

Participants

CUA

  • Franz Klein (Professor of Physics)

JLab reviewers

  • Fernando Barbosa (Hall D eletrical engineer)
  • Eugene Chudakov (Hall D group leader)
  • William Crahen (Hall D engineer)
  • Glenn Young (Associate Project Manager for Physics)
  • Mark Ito (Hall D Staff)
  • Bruce Lenzer (JLab ESH&Q)
  • Vladimir Popov (JLab, ESH)
  • Elton Smith (Hall D Staff)
  • Alexander Somov (Hall D Staff, SOTR)
  • Timothy Whitlatch (Hall D engineer)
  • Jarrod Fitzpatrick (CFO)

Topics/Issues that need discussion/resolution

Documents on the Hodoscope Construction

Meeting Agenda

  • 13:30 Project Overview
    • Scope of contract and current review
    • Status of construction
  • 14:00 Review construction procedures
    Work performed at CUA
    • Inspection (measurement) of scintillators and light guides. Parameters recording.
    • Wrapping materials
    • Wrapping procedures
    • Final inspection, storage, and shipping counters to JLab
    Work performed at JLab
    • Checking PMTs and electronics
    • Overview counter's mounting frame and procedures
    • Fixture to mount light guides on the support collar
    • Gluing PMTs to light guides (gluing fixture, joint inspection).
    • Mounting counters on the support frame (position and alignment checks)
    • Final counter fabrication (housing, connectors ...)
    • Final bench tests (HV, electronics)
    Installation of counter frames in the Hall
    • Installation procedures
    • Final Tests
  • Review Technical Documents
    • Construction Plan
    • Testing procedures
    • Quality Assurance Plans and Acceptance Test Plans
    • Documentation and Travelers
    • Personnel training
    • Schedule and Tracking
  • 15:00 Meeting with JLab Financial people.
    • Billing and Reporting
  • 15:30 Closeout
  • 15:40 Adjourn

Contract Related Documents

(use gluex account to access files)

Construction Plan

Quality Assurance and Acceptance Test Plan

Statement of Work

Personnel Training

Quality Assurance Checklist