Hodoscope Fabrication Readiness Review

From GlueXWiki
Revision as of 12:01, 7 June 2013 by Somov (Talk | contribs) (Meeting Agenda)

Jump to: navigation, search

Date and Time

June 11, 2013

Video Connection information if needed

JLab Conference Room L102

  • ESNET and EVO session
  • Phone only if requested:
    • +1-866-740-1260 : US
    • access code: 3421244# (remember the "#"). Phone line by request only.

Participants

CUA

  • Franz Klein (Professor of Physics)


JLab

  • Fernando Barbosa (Hall D eletrical engineer)
  • Eugene Chudakov (Hall D group leader)
  • William Crahen (Hall D engineer)
  • Bruce Lenzer (JLab ESH&Q)
  • Mark Ito (Hall D Staff)
  • Elton Smith (Hall D Staff)
  • Alexander Somov (Hall D Staff, SOTR)
  • Timothy Whitlatch (Hall D engineer)
  • Jarrod Fitzpatrick (CFO)

Topics/Issues that need discussion/resolution

Documents on the Hodoscope Construction

Meeting Agenda

  • 13:00 Overview of the Construction Facilities at CUA.
  • 13:30 Project Overview
    • Scope of contract and current review
    • Status of construction
  • 14:00 Review of the construction procedures and corresponding Technical Documents
Work performed at CUA
    • Inspection (measurement) of scintillators and light guides. Parameters recording.
    • Wrapping materials
    • Wrapping procedures
    • Final inspection, storage, and shipping counters to JLab
    • Final Construction Plan and Facilities
    • Testing procedures
    • Quality Assurance Plans and Acceptance Test Plans
    • Documentation and Travelers
    • Personnel training
    • Schedule and Tracking
  • 15:00 Meeting with JLab Financial people.
    • Billing and Reporting
  • 15:30 Closeout
  • 15:40 Adjourn

Contract Related Documents

(use gluex account to access files)

Construction Plan

Quality Assurance and Acceptance Test Plan