Difference between revisions of "JEF meeting, April 22, 2022"

From GlueXWiki
Jump to: navigation, search
Line 20: Line 20:
 
** status mini-symposium at DNP 2022 fall meeting: DNP 2022 web site is https://tigers.phys.lsu.edu/dnp2022/
 
** status mini-symposium at DNP 2022 fall meeting: DNP 2022 web site is https://tigers.phys.lsu.edu/dnp2022/
 
** proposal ECT* (https://www.ectstar.eu/) workshop, [[:file:Call_for_2023_Project_Proposals.pdf | form]]
 
** proposal ECT* (https://www.ectstar.eu/) workshop, [[:file:Call_for_2023_Project_Proposals.pdf | form]]
 +
 +
=Minutes=
 +
Attendees: Arshak, Igal, Tegan, Bill, Sasha, Liping, Tim B., Jane, Jon, Phil, Olga, Susan, Azizah, S.T.
 +
* Several students plan to come to the lab during the summer
 +
** 3 affiliated with GWU, 2 from Lamar, 3 from UNCW, 1 TBD from URegina
 +
** Sasha has identified several hardware tasks related to module fabrication
 +
* Now up to 320 fabricated modules as of the meeting
 +
* Relocation to new lab space some time in May?
 +
* Arshak continuing to work on LMS development
 +
** Constructed DIY integrating sphere while we wait for the procurement of the real thing to proceed
 +
** New plexiglas sheet ordered
 +
** Plan for injecting light on each side is moving forward
 +
*** Looking for commercially-available connects for inserting fibers, but may have to 3D print
 +
** Existing plexiglas for FCAL-1 needs to be modified
 +
* Liping will go to Snowmass parallel meeting in mid May
 +
* Susan to take the lead regarding application for a possible ECT* workshop next year (deadline is May 20, 2022)

Revision as of 09:20, 25 April 2022

meeting time and location

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

Minutes

Attendees: Arshak, Igal, Tegan, Bill, Sasha, Liping, Tim B., Jane, Jon, Phil, Olga, Susan, Azizah, S.T.

  • Several students plan to come to the lab during the summer
    • 3 affiliated with GWU, 2 from Lamar, 3 from UNCW, 1 TBD from URegina
    • Sasha has identified several hardware tasks related to module fabrication
  • Now up to 320 fabricated modules as of the meeting
  • Relocation to new lab space some time in May?
  • Arshak continuing to work on LMS development
    • Constructed DIY integrating sphere while we wait for the procurement of the real thing to proceed
    • New plexiglas sheet ordered
    • Plan for injecting light on each side is moving forward
      • Looking for commercially-available connects for inserting fibers, but may have to 3D print
    • Existing plexiglas for FCAL-1 needs to be modified
  • Liping will go to Snowmass parallel meeting in mid May
  • Susan to take the lead regarding application for a possible ECT* workshop next year (deadline is May 20, 2022)