Difference between revisions of "JEF meeting, August 19, 2022"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 9: Line 9:
 
** [https://halldweb.jlab.org/wiki/index.php/CRYTUR Discuss possibility to order 20 more CRYTUR crystals during this F.Y. Have already received 5 more crystals from physics division].  
 
** [https://halldweb.jlab.org/wiki/index.php/CRYTUR Discuss possibility to order 20 more CRYTUR crystals during this F.Y. Have already received 5 more crystals from physics division].  
 
** Meeting with the DSG group: Mindy and George will continue working on the project in September
 
** Meeting with the DSG group: Mindy and George will continue working on the project in September
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf Preparation of parts][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students1.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students2.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students3.jpg]
+
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf Preparation of parts][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students1.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students2.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students3.jpg]. Remaining components:
*** Need: 300 brass assemblies (Keith and Chris will continue to work on them. Waiting for straps)
+
*** 300 brass assemblies (Keith and Chris will continue to work on them,  waiting for straps)
*** Expect to receive remaining 200 light guides during a couple of next weeks.
+
*** 200 light guides during a couple of next weeks.
*** Need about 400 PMT housing
+
*** 400 PMT housings, expect to receive during next two months (bottleneck now)
** Task for the next week: Perform inventory of all fabricated crystals. Prepare to move to the new lab.
+
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals:] 682
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals:] 684
+
*** <span style="color:#FF0000"> All currently available </span>
*** <span style="color:#FF0000"> All currently available </span> (consider to borrow some spares from NPS)
+
 
* Module fabrication  -- Sasha
 
* Module fabrication  -- Sasha
 
** Received 85 PMT housings from Tim, they have been honed by Bobby. All of them will be used today.
 
** Received 85 PMT housings from Tim, they have been honed by Bobby. All of them will be used today.

Revision as of 23:09, 18 August 2022

Meeting time and location:

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

  • Module fabrication -- Sasha
  • Light Monitoring System -- Arshak