Line 9: | Line 9: | ||
** [https://halldweb.jlab.org/wiki/index.php/CRYTUR Discuss possibility to order 20 more CRYTUR crystals during this F.Y. Have already received 5 more crystals from physics division]. | ** [https://halldweb.jlab.org/wiki/index.php/CRYTUR Discuss possibility to order 20 more CRYTUR crystals during this F.Y. Have already received 5 more crystals from physics division]. | ||
** Meeting with the DSG group: Mindy and George will continue working on the project in September | ** Meeting with the DSG group: Mindy and George will continue working on the project in September | ||
− | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf Preparation of parts][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students1.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students2.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students3.jpg] | + | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf Preparation of parts][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students1.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students2.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/students3.jpg]. Remaining components: |
− | *** | + | *** 300 brass assemblies (Keith and Chris will continue to work on them, waiting for straps) |
− | *** | + | *** 200 light guides during a couple of next weeks. |
− | *** | + | *** 400 PMT housings, expect to receive during next two months (bottleneck now) |
− | + | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals:] 682 | |
− | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals:] | + | *** <span style="color:#FF0000"> All currently available </span> |
− | *** <span style="color:#FF0000"> All currently available </span> | + | |
* Module fabrication -- Sasha | * Module fabrication -- Sasha | ||
** Received 85 PMT housings from Tim, they have been honed by Bobby. All of them will be used today. | ** Received 85 PMT housings from Tim, they have been honed by Bobby. All of them will be used today. |
Revision as of 23:09, 18 August 2022
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Simulations/Analysis
- Preparation of parts for FCAL2 modules -- Sasha
- Discuss possibility to order 20 more CRYTUR crystals during this F.Y. Have already received 5 more crystals from physics division.
- Meeting with the DSG group: Mindy and George will continue working on the project in September
- Preparation of parts[1][2][3]. Remaining components:
- 300 brass assemblies (Keith and Chris will continue to work on them, waiting for straps)
- 200 light guides during a couple of next weeks.
- 400 PMT housings, expect to receive during next two months (bottleneck now)
- Wrapped CRYTUR crystals: 682
- All currently available
- Module fabrication -- Sasha
- Received 85 PMT housings from Tim, they have been honed by Bobby. All of them will be used today.
- Status of fabrication
- Fabricated modules: Total 1153
- All SICCAS 577 SICCAS
- 576 CRYTUR, Remaining: 121
- Clean room EEL126 [4][5]
- Expect to move to the new lab EEL108 (the same building) [6]
- Work on amending safety docs
- Module fabrication -- Sasha
- Light Monitoring System -- Arshak