Difference between revisions of "JEF meeting, August 19, 2022"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 16: | Line 16: | ||
*** <span style="color:#FF0000"> All currently available </span> | *** <span style="color:#FF0000"> All currently available </span> | ||
* Module fabrication -- Sasha | * Module fabrication -- Sasha | ||
− | ** Received | + | ** Received 72 PMT housings from Tim a couple of days ago; used practically all of them |
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] | ||
− | ** Fabricated modules: <span style="color:#FF0000"> Total | + | ** Fabricated modules: <span style="color:#FF0000"> Total 1206 (new milestone)</span> |
− | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All SICCAS | + | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All SICCAS 576 SICCAS] |
− | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf | + | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 630 CRYTUR], Remaining: 52 |
** Clean room EEL126 [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/8_5_22/eel_shelves.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/8_5_22/eel_shelves1.jpg] | ** Clean room EEL126 [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/8_5_22/eel_shelves.jpg][https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/8_5_22/eel_shelves1.jpg] | ||
*** Expect to move to the new lab EEL108 (the same building) [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/8_5_22/eel_108.jpg] | *** Expect to move to the new lab EEL108 (the same building) [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/8_5_22/eel_108.jpg] |
Revision as of 23:19, 18 August 2022
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Simulations/Analysis
- Preparation of parts for FCAL2 modules -- Sasha
- Discuss possibility to order 20 more CRYTUR crystals during this F.Y. Have already received 5 more crystals from physics division.
- Meeting with the DSG group: Mindy and George will continue working on the project in September
- Preparation of parts[1][2][3]. Remaining components:
- 300 brass assemblies (Keith and Chris will continue to work on them, waiting for straps)
- 200 light guides during a couple of next weeks.
- 400 PMT housings, expect to receive during next two months (bottleneck now)
- Wrapped CRYTUR crystals: 682
- All currently available
- Module fabrication -- Sasha
- Received 72 PMT housings from Tim a couple of days ago; used practically all of them
- Status of fabrication
- Fabricated modules: Total 1206 (new milestone)
- All SICCAS 576 SICCAS
- 630 CRYTUR, Remaining: 52
- Clean room EEL126 [4][5]
- Expect to move to the new lab EEL108 (the same building) [6]
- Work on amending safety docs
- Module fabrication -- Sasha
- Light Monitoring System -- Arshak