Attendees:  Bill, Olga, Sasha, Jon, Zisis, Arshak, Igal, Liping, Azizah, Tim B., S.T.
 +
* Vacuum chamber and pump ready to be sent to GWU
 +
** Need to have some fixtures needed for silicon cookie production made, to be ordered by Sasha next week
 +
** Loan agreement in works
 +
** Olga to come to lab week of 21st, plan to bring equipment back to GWU
 +
* Detector support group started working on pre-shaping ESR foils, done 36 so far
 +
* Sasha and Arshak working on module construction
 +
** Finished another 27 for a grand total of 41
 +
** Found problems with brazing that need to be addressed
 +
* Arshak working on LMS development -- needs DAQ (we have a working system but it has not been used for a while)

Revision as of 15:51, 11 February 2022

Meeting time and location

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

  • Preparation for mass production of FCAL2 modules -- Sasha

Minutes

Attendees: Bill, Olga, Sasha, Jon, Zisis, Arshak, Igal, Liping, Azizah, Tim B., S.T.

  • Vacuum chamber and pump ready to be sent to GWU
    • Need to have some fixtures needed for silicon cookie production made, to be ordered by Sasha next week
    • Loan agreement in works
    • Olga to come to lab week of 21st, plan to bring equipment back to GWU
  • Detector support group started working on pre-shaping ESR foils, done 36 so far
  • Sasha and Arshak working on module construction
    • Finished another 27 for a grand total of 41
    • Found problems with brazing that need to be addressed
  • Arshak working on LMS development -- needs DAQ (we have a working system but it has not been used for a while)