*** Expect to receive 95 more CRYTUR crystals in May (835 + 95 = 930 in total)
 
*** Expect to receive 95 more CRYTUR crystals in May (835 + 95 = 930 in total)
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 835 (ALL available CRYTUR) ]  
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 835 (ALL available CRYTUR) ]  
*** Available for wrapping: 52 SICCAS crystals from CCAL [https://halldweb.jlab.org/wiki/index.php/All_modules_(with_SICCAS_crystals)_are_removed] [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/ccal_crystals.pdf]
+
*** Available for wrapping: 60 SICCAS crystals from CCAL && prototype [https://halldweb.jlab.org/wiki/index.php/All_modules_(with_SICCAS_crystals)_are_removed] [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/ccal_crystals.pdf]
 
*** George (DSG group) started disassembling CCAL modules and removing LMS caps.
 
*** George (DSG group) started disassembling CCAL modules and removing LMS caps.
 
*** Mindy (DSG group) continues wrapping crystals and soldering wires to sockets
 
*** Mindy (DSG group) continues wrapping crystals and soldering wires to sockets

Revision as of 05:43, 3 February 2023

Meeting time and location:

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

during next week. The CCAL prototype should be ready by the end of next week (?)

  • Installation of the FCAL2 detector -- Sasha / Arshak
  • Light Monitoring System -- Arshak