Difference between revisions of "JEF meeting, February 4, 2022"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
(6 intermediate revisions by 2 users not shown)
Line 7: Line 7:
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/2_4_22/siccas_nps.jpg  Inventory of NPS SICCAS crystals]
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/2_4_22/siccas_nps.jpg  Inventory of NPS SICCAS crystals]
 
** Coordination activities with the DSG
 
** Coordination activities with the DSG
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/2_4_22/equip_gwu.jpg  Equipment for GWU (production of silicon cookies)]
+
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/2_4_22/equip_gwu.jpg  Equipment for GWU (production of silicon cookies, air flow hood )]
 
* Module fabrication  -- Sasha
 
* Module fabrication  -- Sasha
 
** [https://logbooks.jlab.org/entry/3982001  Arshak and Sasha are working on preparation of parts]  
 
** [https://logbooks.jlab.org/entry/3982001  Arshak and Sasha are working on preparation of parts]  
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/2_4_22/fab_modules.jpg Fabricated modules]
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/2_4_22/fab_modules.jpg Fabricated modules]
*** [https://docs.google.com/document/d/1upI9M_RNR4qipzwg-SmxmzkqoCDU294x7Y3jT5M6DVY/edit List of modules]
+
::: [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/2_4_22/module_fabrication.pdf List of fabricated modules] [https://docs.google.com/document/d/1upI9M_RNR4qipzwg-SmxmzkqoCDU294x7Y3jT5M6DVY/edit (list on Google Drive)]
 
** Fabrication schedule
 
** Fabrication schedule
 
* Light Monitoring System
 
* Light Monitoring System
Line 18: Line 18:
 
* Simulations
 
* Simulations
 
** [https://halldweb.jlab.org/DocDB/0054/005405/001/FEB02_eff.pdf Single and double photon gun efficiencies] - Tegan
 
** [https://halldweb.jlab.org/DocDB/0054/005405/001/FEB02_eff.pdf Single and double photon gun efficiencies] - Tegan
 +
 +
=Minutes=
 +
Attendees: Bill,Olga,Igal,Sasha,Tegan,Zisis,Jane,Arshak,Tim B.,Jon,Liping,Susan,Phil,S.T.
 +
* Sasha went over preparations from mass production of FCAL2 modules
 +
** Inventory of SICCAS crystals that NPS does not plan to use:  ~440 "good" crystals
 +
** Detector support group started working on pre-shaping ESR, also will work on wrapping
 +
** Equipment for GWU (for production of silicon cookies):  airflow box, vacuum chamber, pump
 +
** Arshak and Sasha started producing cookies and light guides
 +
** Chris A. working on brazing brass strips (some assemblies too small)
 +
* Arshak and Sasha constructed 14 new modules
 +
** Takes about 30-40 minutes per module
 +
** Can produce ~20/week/person
 +
** Keeping track of progress on google drive
 +
** PMT divider work on hold in favor of module production for now
 +
* Arshak working on light monitoring system
 +
** Enough parts to construct plexiglas prototype for 5x5 crystal array
 +
* Loan agreement and contract with GWU in the works
 +
* Tegan presented an update on photon reconstruction efficiencies using single and double photon gun simulations
 +
** Island and default algorithms have almost the same efficiency as a function of angle for single photons
 +
** Efficiency profile tracks with conversions in material upstream of FCAL
 +
** Comparison of 2-photon separation between two algorithms still needs work

Latest revision as of 20:44, 17 February 2022

Meeting time and location

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

List of fabricated modules (list on Google Drive)

Minutes

Attendees: Bill,Olga,Igal,Sasha,Tegan,Zisis,Jane,Arshak,Tim B.,Jon,Liping,Susan,Phil,S.T.

  • Sasha went over preparations from mass production of FCAL2 modules
    • Inventory of SICCAS crystals that NPS does not plan to use: ~440 "good" crystals
    • Detector support group started working on pre-shaping ESR, also will work on wrapping
    • Equipment for GWU (for production of silicon cookies): airflow box, vacuum chamber, pump
    • Arshak and Sasha started producing cookies and light guides
    • Chris A. working on brazing brass strips (some assemblies too small)
  • Arshak and Sasha constructed 14 new modules
    • Takes about 30-40 minutes per module
    • Can produce ~20/week/person
    • Keeping track of progress on google drive
    • PMT divider work on hold in favor of module production for now
  • Arshak working on light monitoring system
    • Enough parts to construct plexiglas prototype for 5x5 crystal array
  • Loan agreement and contract with GWU in the works
  • Tegan presented an update on photon reconstruction efficiencies using single and double photon gun simulations
    • Island and default algorithms have almost the same efficiency as a function of angle for single photons
    • Efficiency profile tracks with conversions in material upstream of FCAL
    • Comparison of 2-photon separation between two algorithms still needs work