Difference between revisions of "JEF meeting, February 4, 2022"

From GlueXWiki
Jump to: navigation, search
m (Minutes)
(Agenda)
 
Line 7: Line 7:
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/2_4_22/siccas_nps.jpg  Inventory of NPS SICCAS crystals]
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/2_4_22/siccas_nps.jpg  Inventory of NPS SICCAS crystals]
 
** Coordination activities with the DSG
 
** Coordination activities with the DSG
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/2_4_22/equip_gwu.jpg  Equipment for GWU (production of silicon cookies)]
+
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/2_4_22/equip_gwu.jpg  Equipment for GWU (production of silicon cookies, air flow hood )]
 
* Module fabrication  -- Sasha
 
* Module fabrication  -- Sasha
 
** [https://logbooks.jlab.org/entry/3982001  Arshak and Sasha are working on preparation of parts]  
 
** [https://logbooks.jlab.org/entry/3982001  Arshak and Sasha are working on preparation of parts]  

Latest revision as of 20:44, 17 February 2022

Meeting time and location

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

List of fabricated modules (list on Google Drive)

Minutes

Attendees: Bill,Olga,Igal,Sasha,Tegan,Zisis,Jane,Arshak,Tim B.,Jon,Liping,Susan,Phil,S.T.

  • Sasha went over preparations from mass production of FCAL2 modules
    • Inventory of SICCAS crystals that NPS does not plan to use: ~440 "good" crystals
    • Detector support group started working on pre-shaping ESR, also will work on wrapping
    • Equipment for GWU (for production of silicon cookies): airflow box, vacuum chamber, pump
    • Arshak and Sasha started producing cookies and light guides
    • Chris A. working on brazing brass strips (some assemblies too small)
  • Arshak and Sasha constructed 14 new modules
    • Takes about 30-40 minutes per module
    • Can produce ~20/week/person
    • Keeping track of progress on google drive
    • PMT divider work on hold in favor of module production for now
  • Arshak working on light monitoring system
    • Enough parts to construct plexiglas prototype for 5x5 crystal array
  • Loan agreement and contract with GWU in the works
  • Tegan presented an update on photon reconstruction efficiencies using single and double photon gun simulations
    • Island and default algorithms have almost the same efficiency as a function of angle for single photons
    • Efficiency profile tracks with conversions in material upstream of FCAL
    • Comparison of 2-photon separation between two algorithms still needs work