Difference between revisions of "JEF meeting, January 27, 2023"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 10: Line 10:
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 835 (ALL available CRYTUR) ]  
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 835 (ALL available CRYTUR) ]  
 
*** Available for wrapping: 52 SICCAS crystals from CCAL [https://halldweb.jlab.org/wiki/index.php/All_modules_(with_SICCAS_crystals)_are_removed] [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/ccal_crystals.pdf]
 
*** Available for wrapping: 52 SICCAS crystals from CCAL [https://halldweb.jlab.org/wiki/index.php/All_modules_(with_SICCAS_crystals)_are_removed] [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/ccal_crystals.pdf]
 +
*** George (DSG group) started disassembling CCAL modules and removing LMS caps.
 
*** Mindy (DSG group) continues wrapping crystals and soldering wires to sockets
 
*** Mindy (DSG group) continues wrapping crystals and soldering wires to sockets
 
**  Disassembling CCAL
 
**  Disassembling CCAL

Revision as of 09:41, 27 January 2023

Meeting time and location:

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda