*'''Preparation of parts for ECAL modules''' -- Sasha  
 
*'''Preparation of parts for ECAL modules''' -- Sasha  
 
** Crystals:  
 
** Crystals:  
Line 16: Line 17:
 
* '''Ongoing projects''' -- Sasha, all
 
* '''Ongoing projects''' -- Sasha, all
 
** Visual inspections of fabricated modules [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/19_05_2023/modules_qa.docx] - done   
 
** Visual inspections of fabricated modules [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/19_05_2023/modules_qa.docx] - done   
** Prepare to move modules into Hall D [https://halldweb.jlab.org/detectors/fcal2/installation/photos/move_to_halld/prepare_to_move.jpg]  
+
** Prepare to move modules into Hall D [https://halldweb.jlab.org/detectors/fcal2/installation/photos/move_to_halld/prepare_to_move.jpg] [https://halldweb.jlab.org/detectors/fcal2/installation/photos/move_to_halld/prepare_to_move1.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/photos/move_to_halld/prepare_to_move2.jpg]
** Prepare space for the ECAL in Hall D. Move and install shelves. 70 modules have already been moved into the hall.
+
** Prepare space for the ECAL in Hall D. Move and install shelves. 70 modules have already been moved into the hall [https://halldweb.jlab.org/detectors/fcal2/installation/photos/move_to_halld/prepare_to_move3.jpg].
** Tested, labeled, and bundled (53 bundlesout of 100) [https://halldweb.jlab.org/detectors/fcal2/installation/photos/label_signal/signal_bundles.jpg] of signal cables connected from the flash ADC to the patch panel [https://halldweb.jlab.org/wiki/index.php/Testing_and_labeling_cables]
+
** Tested, labeled, and bundled (53 bundlesout of 100) [https://halldweb.jlab.org/detectors/fcal2/installation/photos/label_signal/signal_bundles.jpg] of signal cables connected from the flash ADC to the patch panel [https://halldweb.jlab.org/wiki/index.php/Testing_and_labeling_cables]. Receive cartridges for the printer, will resume labeling and cable bundling today.
 
** Removing signal cables from the FCAL and rearranging signal cables in the hall [https://halldweb.jlab.org/wiki/index.php/Removing_FCAL_cables_from_the_detector] [https://halldweb.jlab.org/wiki/index.php/Rearranging_FCAL_cables Rearranging_FCAL_cables] - done
 
** Removing signal cables from the FCAL and rearranging signal cables in the hall [https://halldweb.jlab.org/wiki/index.php/Removing_FCAL_cables_from_the_detector] [https://halldweb.jlab.org/wiki/index.php/Rearranging_FCAL_cables Rearranging_FCAL_cables] - done
 
**: - 400 signal cables were removed,re-labeled and bundled
 
**: - 400 signal cables were removed,re-labeled and bundled
Line 30: Line 31:
 
* '''[https://halldweb.jlab.org/wiki/index.php/FCAL_Insert_Module_Fabrication Proceedures]'''
 
* '''[https://halldweb.jlab.org/wiki/index.php/FCAL_Insert_Module_Fabrication Proceedures]'''
 
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Arshak / Vlad / Hakob
 
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Arshak / Vlad / Hakob
** Started installing detector modules [https://logbooks.jlab.org/book/halld]
+
** Started installing detector modules [https://logbooks.jlab.org/book/halld][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector1.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector.jpg]
 
** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page]
 
** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page]
 
** Updates from the meetings with Tim's group [https://halldweb.jlab.org/wiki/index.php/FCAL_2_Design_Meetings]
 
** Updates from the meetings with Tim's group [https://halldweb.jlab.org/wiki/index.php/FCAL_2_Design_Meetings]
Line 40: Line 41:
 
*'''Light monitoring system''' -- Arshak
 
*'''Light monitoring system''' -- Arshak
  
 +
*'''Simulations/Analysis'''
 +
** [[File:island_july23.pdf]] Update on Island algorithm (Simon)
  
=Agenda=
+
=Minutes=
*'''Preparation of parts for ECAL modules''' -- Sasha
+
Attendees: Bill, Arshak, Igal, Sasha, Liping, Jane, Susan, Olga, Axel, S.T.
* '''Module fabrication'''  -- Sasha 
+
* Jane's group inspected 88 SICCAS crystals, of which we will reject 22
* '''Ongoing projects''' -- Sasha, all
+
** 66 crystals to be sent to JLab, will be inspected on site
* '''[[Testing of PMT dividers]]''' -- Sasha / Vlad
+
* Have 1602 good FCAL-2 modules and ~30? scratched/chipped/poorly wrapped spares in hand
* '''[https://halldweb.jlab.org/wiki/index.php/FCAL_Insert_Module_Fabrication Proceedures]'''
+
* Checked 644 modules using LED in black box, saw ~25% spread in amplitude
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Arshak / Vlad / Hakob
+
* Wrapping assemblies in plastic in preparation for moving to hall
*'''Light monitoring system''' -- Arshak
+
* Short cables for installation in dark room arriving
* '''Simulations/Analysis'''
+
* Need to make 47 large cable bundles
** [[File:island_july23.pdf]]
+
* All donuts glued and fibers polished for existing fibers, still waiting for remaining fibers
 +
* Stacking LG in hall continues -- as of meeting, up to layer where lead tungstate crystals would be installed
 +
** Survey and alignment crew checked flatness
 +
* Reference PMTs for LMS will probably need additional magnetic field shielding
 +
* Discussed idea of installing fiber profiler in front of COMCAL to aid in measuring the transverse shower profile
 +
* Simon presented an update on the island algorithm development
 +
** Added S-curve correction to try to remove residual position bias
 +
** Simulation studies indicate small overall position bias, needs to be understood
 +
** Island algorithm works better for insert than for LG region, needs to be understood
 +
** Staggered geometry needs to be added to geometry specification

Latest revision as of 07:47, 24 July 2023

Meeting time and location:

Agenda

  • Preparation of parts for ECAL modules -- Sasha
    • Crystals:
      - Received all crystals from CRYTUR [1].
      - Jane with students performed inspection of 88 crystals, expect to receive 66
    • Received all long signal cables from the first order (1200). Received 450 short signal cables [2]
    • Procurement parts for the LMS:
      - Waiting for 7,600 ft of optical fibers (August/September)
  • Module fabrication -- Sasha
    • All modules have been fabricated, proceed with the final inventorization (about 1610 modules in total)
    • Fixing about 20 modules with small imperfections (overlapping Tedla)
  • Ongoing projects -- Sasha, all
    • Visual inspections of fabricated modules [3] - done
    • Prepare to move modules into Hall D [4] [5][6]
    • Prepare space for the ECAL in Hall D. Move and install shelves. 70 modules have already been moved into the hall [7].
    • Tested, labeled, and bundled (53 bundlesout of 100) [8] of signal cables connected from the flash ADC to the patch panel [9]. Receive cartridges for the printer, will resume labeling and cable bundling today.
    • Removing signal cables from the FCAL and rearranging signal cables in the hall [10] Rearranging_FCAL_cables - done
      - 400 signal cables were removed,re-labeled and bundled
      - all cables have been re-arranged, two VXS crates can be removed (will be used by the ECAL)
      - install two flash ADCs
    • Cutting optical fibers and gluing plastic caps [11]
    • Report from students
    • Test fabricated modules using LMS [12] 644 modules have been tested.
  • Testing of PMT dividers -- Sasha / Vlad
    • All electronics components received, will be shiped to the company to fabricate dividers today (Chris)
  • Proceedures
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Arshak / Vlad / Hakob
  • Light monitoring system -- Arshak

Minutes

Attendees: Bill, Arshak, Igal, Sasha, Liping, Jane, Susan, Olga, Axel, S.T.

  • Jane's group inspected 88 SICCAS crystals, of which we will reject 22
    • 66 crystals to be sent to JLab, will be inspected on site
  • Have 1602 good FCAL-2 modules and ~30? scratched/chipped/poorly wrapped spares in hand
  • Checked 644 modules using LED in black box, saw ~25% spread in amplitude
  • Wrapping assemblies in plastic in preparation for moving to hall
  • Short cables for installation in dark room arriving
  • Need to make 47 large cable bundles
  • All donuts glued and fibers polished for existing fibers, still waiting for remaining fibers
  • Stacking LG in hall continues -- as of meeting, up to layer where lead tungstate crystals would be installed
    • Survey and alignment crew checked flatness
  • Reference PMTs for LMS will probably need additional magnetic field shielding
  • Discussed idea of installing fiber profiler in front of COMCAL to aid in measuring the transverse shower profile
  • Simon presented an update on the island algorithm development
    • Added S-curve correction to try to remove residual position bias
    • Simulation studies indicate small overall position bias, needs to be understood
    • Island algorithm works better for insert than for LG region, needs to be understood
    • Staggered geometry needs to be added to geometry specification