Difference between revisions of "JEF meeting, July 8, 2022"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 25: Line 25:
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/clean_room.jpg Clean room EEL126]
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/6_17_22/clean_room.jpg Clean room EEL126]
 
* Light Monitoring System -- Arshak
 
* Light Monitoring System -- Arshak
 +
 +
=Minutes=
 +
Attendees:  Igal, Bill, Susan, Sasha, Liping, Arshak, Jon, S.T.
 +
* Lab has been moved from TEDF to EEL; need to check if any of the crystals got damaged during the move
 +
* Using mu-metal from Hall-C while we wait for our shipment of mu-metal
 +
* Sasha placed order for 50 more Crytur crystals
 +
* Will get 50 spare crystals from NPS
 +
* Fabrication bottlenecks:
 +
** Gluing light guides -- maybe get students involved?
 +
** Brass assemblies:  brazing still has quality control issues
 +
** Silicon cookies
 +
* Module fabrication continues with good pace with student help (Gavin gave the student update)
 +
** Goal of ~1200 fabricated modules by middle of August
 +
* Students were reminded/encouraged to submit for student funding

Revision as of 10:38, 11 July 2022

Meeting time and location=

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

  • Announcements
    • ECT* workshop “Precision Tests of Fundamental Physics with Light Mesons"
      • is approved and will take place June 12-16, 2023
      • Here are the remarks of the ECT* Board: "The proposed workshop will provide a rich program that is very timely. The participants include many experts in the field and the interaction will potentially lead to good insights and new strategies. The ECT* Scientific Board fully supports this proposal."
      • organizers: Susan Schadmand and Bastian Kubis, Igal Jaeglé and Daniel Lersch

Minutes

Attendees: Igal, Bill, Susan, Sasha, Liping, Arshak, Jon, S.T.

  • Lab has been moved from TEDF to EEL; need to check if any of the crystals got damaged during the move
  • Using mu-metal from Hall-C while we wait for our shipment of mu-metal
  • Sasha placed order for 50 more Crytur crystals
  • Will get 50 spare crystals from NPS
  • Fabrication bottlenecks:
    • Gluing light guides -- maybe get students involved?
    • Brass assemblies: brazing still has quality control issues
    • Silicon cookies
  • Module fabrication continues with good pace with student help (Gavin gave the student update)
    • Goal of ~1200 fabricated modules by middle of August
  • Students were reminded/encouraged to submit for student funding