Difference between revisions of "JEF meeting, June 23, 2023"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 44: Line 44:
 
<!-- ** [https://halldweb.jlab.org/detectors/fcal2/installation/photos Disassembling FCAL] -->
 
<!-- ** [https://halldweb.jlab.org/detectors/fcal2/installation/photos Disassembling FCAL] -->
 
*'''Light monitoring system''' -- Arshak
 
*'''Light monitoring system''' -- Arshak
**Fiber polisher [https://userweb.jlab.org/~aasatury/Fcal_LMS/IMG_20230605_174857.jpg]
 
** [https://userweb.jlab.org/~aasatury/Fcal_LMS/fiber_prep/IMG_20230616_090218.jpg ~450 fibers were cut and half of them are already glued to donates]
 
 
** [https://userweb.jlab.org/~aasatury/Fcal_LMS/fiber_prep/IMG_20230616_090332.jpg Glued fibers]
 
** [https://userweb.jlab.org/~aasatury/Fcal_LMS/fiber_prep/IMG_20230616_090332.jpg Glued fibers]
 
* '''Simulations/Analysis'''
 
* '''Simulations/Analysis'''

Revision as of 23:08, 22 June 2023

Meeting time and location:


Agenda

  • Preparation of parts for ECAL modules -- Sasha
    • Crystals:
      - Received all crystals from CRYTUR [1].
      - Available for wrapping: 15 CRYTUR
      - Planned inspection of SICCAS crystals
    • Received 1100 long signal cables
    • Procurement parts for the LMS:
      - 16,400 ft of optical fibers delivered to the lab. 7,600 will be delivered in September.
      - Received all plastic caps
      - Cutting Tedlar foils, preparing silicon cookies, etc.
    • Will send all electronics components to the company to fabricate dividers on Monday next week
  • Module fabrication -- Sasha
    • Fabricated modules: Total 1586 (remaining 24 + spares)
  • Ongoing projects -- Sasha, all
    • Visual inspections of fabricated modules [2]
      -1586 modules have been checked [3]
    • Testing and labeling signal cables (connect flash ADC with the detector distribution panel) [4]
      - 725 long signal cables have been tested [5]
      - Cable tester and label maker
      - 12 bundles of signal cables are ready (out of 100)
    • Removing signal cables from the FCAL and rearranging signal cables in the hall [6]
    • Cutting optical fibers (800 fibers have been cut), gluing plastic caps (380 recently glued)
    • Report from students
  • Testing of PMT dividers -- Sasha / Vlad
    • All dividers have been ordered (by Chris S.)
    • Preparing setups for testing modules and dividers
  • Proceedures
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Arshak / Vlad / Hakob
  • Light monitoring system -- Arshak
  • Simulations/Analysis