=Agenda=
 
=Agenda=
  
'''Preparation of parts for ECAL modules''' -- Sasha  
+
*'''Preparation of parts for ECAL modules''' -- Sasha  
 
** Crystals:  
 
** Crystals:  
**: Received all crystals from CRYTUR [https://halldweb.jlab.org/wiki/index.php/CRYTUR ].  
+
**: - <span style="color:#FF0000"> Received all crystals from CRYTUR [https://halldweb.jlab.org/wiki/index.php/CRYTUR ]. </span> 
**: Available for wrapping: 35 CRYTUR
+
**: - Available for wrapping: 35 CRYTUR
 
** Received 1000 long signal cables
 
** Received 1000 long signal cables
 
** Procurement parts for the LMS:
 
** Procurement parts for the LMS:
**: 16,400 ft of optical fibers delivered to the lab. 7,600 will be delivered in September.
+
**: - 16,400 ft of optical fibers delivered to the lab. 7,600 will be delivered in September.
**: Expect to receive all plastic caps for the LMS today (can start gluing them to fibers during next week)  
+
**: - Expect to receive all plastic caps for the LMS today (can start gluing them to fibers during next week)
** PO submitted for PMT dividers (expect to receive the first batch in the end of June)
+
**: - Cutting Tedlar foils, wrapping PMT light guides, etc.
 +
**  PO submitted for PMT dividers (expect to receive the first batch in the end of June)
 
* '''Module fabrication'''  -- Sasha   
 
* '''Module fabrication'''  -- Sasha   
 
<!-- ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf  Status of fabrication ] -->
 
<!-- ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf  Status of fabrication ] -->
 
** Fabricated modules: <span style="color:#FF0000"> Total 1572 </span>  (remaining 24 + spares)
 
** Fabricated modules: <span style="color:#FF0000"> Total 1572 </span>  (remaining 24 + spares)
**: 10 modules fabricated during last week  <!-- [[File:Fab_mod_may_2023.jpg]] -->
+
**: - 10 modules fabricated during last week  <!-- [[File:Fab_mod_may_2023.jpg]] -->
 
** [https://docs.google.com/presentation/d/1euIA49SszoQmSM4Lxu1OtZ8OfjltgwzXIbXo6TPEB3s/edit#slide=id.p Report from students]
 
** [https://docs.google.com/presentation/d/1euIA49SszoQmSM4Lxu1OtZ8OfjltgwzXIbXo6TPEB3s/edit#slide=id.p Report from students]
* '''Visual inspections of fabricated modules [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/19_05_2023/modules_qa.docx] '''
+
* '''Ongoing projects''' -- Sasha, all
*:  -1357 modules have been checked (572 SICCAS + 785 CRYTUR)  [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/19_05_2023/modules_shelves.jpg]
+
** Visual inspections of fabricated modules [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/19_05_2023/modules_qa.docx]
* '''Testing and labeling cables'''
+
**:  -1357 modules have been checked (572 SICCAS + 785 CRYTUR)  [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/19_05_2023/modules_shelves.jpg]
** [https://halldweb.jlab.org/wiki/index.php/Testing_labeling_cables Cable tester and label maker]
+
** Testing and labeling signal cables (connect flash ADC with the detector distribution panel) [https://halldweb.jlab.org/wiki/index.php/Testing_and_labeling_cables]
**: - 600 long signal cables have been tested [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/25_05_2023/boxes_with_labels.jpg]
+
**: - 725 long signal cables have been tested [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/25_05_2023/boxes_with_labels.jpg]
* '''Removing signal cables from the FCAL''' [https://halldweb.jlab.org/wiki/index.php/Removing_FCAL_cables_from_the_detector]
+
**: - [https://halldweb.jlab.org/wiki/index.php/Testing_labeling_cables Cable tester and label maker]
 +
**: - 12 bundles of signal cables are ready (out of 100)
 +
** Removing signal cables from the FCAL [https://halldweb.jlab.org/wiki/index.php/Removing_FCAL_cables_from_the_detector]
 
* '''[[Testing of PMT dividers]]''' -- Sasha / Vlad
 
* '''[[Testing of PMT dividers]]''' -- Sasha / Vlad
** Most parts for the active base have been arrived to the lab (including PCBs)
+
** All dividers have been ordered (by Chris S.)
** All dividers will be ordered during next week (by Chris S.)
+
** Preparing setups for testing modules and dividers
 
* '''[https://halldweb.jlab.org/wiki/index.php/FCAL_Insert_Module_Fabrication Proceedures]'''
 
* '''[https://halldweb.jlab.org/wiki/index.php/FCAL_Insert_Module_Fabrication Proceedures]'''
 
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Arshak
 
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Arshak
 
** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page]
 
** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page]
 
** Updates from the meetings with Tim's group [https://halldweb.jlab.org/wiki/index.php/FCAL_2_Design_Meetings]
 
** Updates from the meetings with Tim's group [https://halldweb.jlab.org/wiki/index.php/FCAL_2_Design_Meetings]
:: Discussion of the FCAL2 installation procedures [https://halldweb.jlab.org/wiki/index.php/FCAL_2_Installation_Meetings]  
+
** Discussion of the FCAL2 installation procedures [https://halldweb.jlab.org/wiki/index.php/FCAL_2_Installation_Meetings]  
 
** [https://halldweb.jlab.org/wiki/index.php/Distribution_of_signals_and_voltages Final mapping of low-voltage cables]
 
** [https://halldweb.jlab.org/wiki/index.php/Distribution_of_signals_and_voltages Final mapping of low-voltage cables]
 
** Manpower and division of tasks
 
** Manpower and division of tasks
Line 39: Line 42:
 
<!-- ** [https://halldweb.jlab.org/detectors/fcal2/installation/photos Disassembling FCAL] -->
 
<!-- ** [https://halldweb.jlab.org/detectors/fcal2/installation/photos Disassembling FCAL] -->
 
*'''Light monitoring system''' -- Arshak
 
*'''Light monitoring system''' -- Arshak
 
+
**Fiber polisher [https://userweb.jlab.org/~aasatury/Fcal_LMS/IMG_20230605_174857.jpg]
 
* '''Simulations/Analysis'''
 
* '''Simulations/Analysis'''
 
* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=6092 Talk at ECT* workshop next week] -- Simon
 
* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=6092 Talk at ECT* workshop next week] -- Simon

Latest revision as of 09:39, 9 June 2023

Meeting time and location:

Agenda

  • Preparation of parts for ECAL modules -- Sasha
    • Crystals:
      - Received all crystals from CRYTUR [1].
      - Available for wrapping: 35 CRYTUR
    • Received 1000 long signal cables
    • Procurement parts for the LMS:
      - 16,400 ft of optical fibers delivered to the lab. 7,600 will be delivered in September.
      - Expect to receive all plastic caps for the LMS today (can start gluing them to fibers during next week)
      - Cutting Tedlar foils, wrapping PMT light guides, etc.
    • PO submitted for PMT dividers (expect to receive the first batch in the end of June)
  • Module fabrication -- Sasha
    • Fabricated modules: Total 1572 (remaining 24 + spares)
      - 10 modules fabricated during last week
    • Report from students
  • Ongoing projects -- Sasha, all
    • Visual inspections of fabricated modules [2]
      -1357 modules have been checked (572 SICCAS + 785 CRYTUR) [3]
    • Testing and labeling signal cables (connect flash ADC with the detector distribution panel) [4]
      - 725 long signal cables have been tested [5]
      - Cable tester and label maker
      - 12 bundles of signal cables are ready (out of 100)
    • Removing signal cables from the FCAL [6]
  • Testing of PMT dividers -- Sasha / Vlad
    • All dividers have been ordered (by Chris S.)
    • Preparing setups for testing modules and dividers
  • Proceedures
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Arshak
  • Light monitoring system -- Arshak
    • Fiber polisher [9]
  • Simulations/Analysis
  • Talk at ECT* workshop next week -- Simon