(Agenda)
(Agenda)
Line 13: Line 13:
 
**: 16,400 ft of optical fibers delivered to the lab. 7,600 will be delivered in September.
 
**: 16,400 ft of optical fibers delivered to the lab. 7,600 will be delivered in September.
 
**: Expect to receive all plastic caps for the LMS today (can start gluing them to fibers during next week)  
 
**: Expect to receive all plastic caps for the LMS today (can start gluing them to fibers during next week)  
 +
** PO submitted for PMT dividers (expect to receive the first batch in the end of June)
 
* '''Module fabrication'''  -- Sasha   
 
* '''Module fabrication'''  -- Sasha   
 
<!-- ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf  Status of fabrication ] -->
 
<!-- ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf  Status of fabrication ] -->

Revision as of 08:43, 9 June 2023

Meeting time and location:

Agenda

Preparation of parts for ECAL modules -- Sasha

    • Crystals:
      Received all crystals from CRYTUR [1].
      Available for wrapping: 35 CRYTUR
    • Received 1000 long signal cables
    • Procurement parts for the LMS:
      16,400 ft of optical fibers delivered to the lab. 7,600 will be delivered in September.
      Expect to receive all plastic caps for the LMS today (can start gluing them to fibers during next week)
    • PO submitted for PMT dividers (expect to receive the first batch in the end of June)
  • Module fabrication -- Sasha
    • Fabricated modules: Total 1572 (remaining 24 + spares)
      10 modules fabricated during last week
    • Report from students
  • Visual inspections of fabricated modules [2]
    -1357 modules have been checked (572 SICCAS + 785 CRYTUR) [3]
  • Testing and labeling cables
  • Removing signal cables from the FCAL [5]
  • Testing of PMT dividers -- Sasha / Vlad
    • Most parts for the active base have been arrived to the lab (including PCBs)
    • All dividers will be ordered during next week (by Chris S.)
  • Proceedures
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Arshak
Discussion of the FCAL2 installation procedures [7]