Difference between revisions of "JEF meeting, June 9, 2023"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 12: Line 12:
 
** Procurement parts for the LMS:
 
** Procurement parts for the LMS:
 
**: 16,400 ft of optical fibers delivered to the lab. 7,600 will be delivered in September.
 
**: 16,400 ft of optical fibers delivered to the lab. 7,600 will be delivered in September.
**: Expect to receive all plastic caps for the LMS today (can start gluing them to fibers during next week)  
+
**: Expect to receive all plastic caps for the LMS today (can start gluing them to fibers during next week)
 +
**: Cutting Tedlar foils, wrapping PMT light guides, etc.
 
** PO submitted for PMT dividers (expect to receive the first batch in the end of June)
 
** PO submitted for PMT dividers (expect to receive the first batch in the end of June)
 
* '''Module fabrication'''  -- Sasha   
 
* '''Module fabrication'''  -- Sasha   

Revision as of 08:47, 9 June 2023

Meeting time and location:

Agenda

Preparation of parts for ECAL modules -- Sasha

    • Crystals:
      Received all crystals from CRYTUR [1].
      Available for wrapping: 35 CRYTUR
    • Received 1000 long signal cables
    • Procurement parts for the LMS:
      16,400 ft of optical fibers delivered to the lab. 7,600 will be delivered in September.
      Expect to receive all plastic caps for the LMS today (can start gluing them to fibers during next week)
      Cutting Tedlar foils, wrapping PMT light guides, etc.
    • PO submitted for PMT dividers (expect to receive the first batch in the end of June)
  • Module fabrication -- Sasha
    • Fabricated modules: Total 1572 (remaining 24 + spares)
      10 modules fabricated during last week
    • Report from students
  • Ongoing projects
    • Visual inspections of fabricated modules [2]
      -1357 modules have been checked (572 SICCAS + 785 CRYTUR) [3]
    • Testing and labeling cables
      - Cable tester and label maker
      - 725 long signal cables have been tested [4]
    • Removing signal cables from the FCAL [5]
  • Testing of PMT dividers -- Sasha / Vlad
    • Most parts for the active base have been arrived to the lab (including PCBs)
    • All dividers will be ordered during next week (by Chris S.)
  • Proceedures
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Arshak
Discussion of the FCAL2 installation procedures [7]