Difference between revisions of "JEF meeting, March 11, 2022"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
(20 intermediate revisions by 3 users not shown)
Line 7: Line 7:
 
* Preparation for mass production of FCAL2 modules -- Sasha
 
* Preparation for mass production of FCAL2 modules -- Sasha
 
** DSG has preshaped about 300 ESR foils. Started wrapping crystals with the ESR and Tedlar (first 10 modules wrapped)
 
** DSG has preshaped about 300 ESR foils. Started wrapping crystals with the ESR and Tedlar (first 10 modules wrapped)
** Chris continues to make brass strap assemblies
+
** Loan agreement with the GWU was submitted for signatures. Two fixtures for silicon cookies were ordered. Olga is planning to come to Jlab on March 21
** Bobby has started working on honing soft iron housing (a few mu-metal are tight (no space for kapton film)  
+
** Chris continues brazing brass strap assemblies
 +
** Bobby has started working on honing soft iron PMT housing (quite a few mu-metal cylinders don't fit into PMT housings)  
 +
** Igal is cutting Tedlar, Kapton, and ESR foils
 
* Module fabrication  -- Sasha
 
* Module fabrication  -- Sasha
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf  Modules fabricated by Arshak and Sasha] [https://docs.google.com/document/d/1upI9M_RNR4qipzwg-SmxmzkqoCDU294x7Y3jT5M6DVY/edit (list on Google Drive)] (grand total 115, fabricated in about a month)
+
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf  Modules fabricated by Arshak and Sasha] [https://docs.google.com/document/d/1upI9M_RNR4qipzwg-SmxmzkqoCDU294x7Y3jT5M6DVY/edit (list on Google Drive)] (grand total 144)
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/2_17_22/fab_mod_2_17_22.jpg Fabricated modules in TEDF ]
+
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/3_11_22/modules_in_tedf_3_11_22.jpg Fabricated modules in TEDF ]
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf  Status of fabrication ]
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf  Status of fabrication ]
 +
 
* Light Monitoring System
 
* Light Monitoring System
 
* COMCAL tests, TAC running, etc.
 
* COMCAL tests, TAC running, etc.
 
* Data analysis
 
* Data analysis
 +
** [https://halldweb.jlab.org/wiki/images/5/55/Glue-jefxd-igal-jaegle-11032022.pdf Project 5]
 
* Simulations
 
* Simulations
* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=5514 FCAL2 Insert Efficiency in Phi -- Azizah]
+
** [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=5514 FCAL2 Insert Efficiency in Phi -- Azizah]
 +
 
 +
=Minutes=
 +
Attendees: Sasha,Susan,Zisis,Phil,Arshak,Igal,Bill,Jon,Olga,Azizah,Jane
 +
*Preparation for module fabrication and fabrication itself continues
 +
** Received support from 2 members of detector support group:  ESR shaping and module wrapping
 +
** Grand total as of meeting was 144 fabricated modules
 +
** Will soon need to move crystals and fabrication area to a different building
 +
** Some discussion of testing the modules, including using beam in upcoming CPP/PrimEx runs
 +
*** Build 5x5 stack?
 +
* Arshak working on LMS
 +
** Contacted Carl Zorn regarding using his setup for checking transmission of light through plexiglas sheet -- equipment not working yet
 +
* Igal described student project 5 for dark matter searches
 +
* Azizah showed photon gun reconstruction efficiency as a function of φ
 +
** Holes at 0, 180 degrees probably due to gap between crystals

Latest revision as of 22:55, 17 March 2022

Meeting time and location

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

  • Preparation for mass production of FCAL2 modules -- Sasha
    • DSG has preshaped about 300 ESR foils. Started wrapping crystals with the ESR and Tedlar (first 10 modules wrapped)
    • Loan agreement with the GWU was submitted for signatures. Two fixtures for silicon cookies were ordered. Olga is planning to come to Jlab on March 21
    • Chris continues brazing brass strap assemblies
    • Bobby has started working on honing soft iron PMT housing (quite a few mu-metal cylinders don't fit into PMT housings)
    • Igal is cutting Tedlar, Kapton, and ESR foils
  • Module fabrication -- Sasha

Minutes

Attendees: Sasha,Susan,Zisis,Phil,Arshak,Igal,Bill,Jon,Olga,Azizah,Jane

  • Preparation for module fabrication and fabrication itself continues
    • Received support from 2 members of detector support group: ESR shaping and module wrapping
    • Grand total as of meeting was 144 fabricated modules
    • Will soon need to move crystals and fabrication area to a different building
    • Some discussion of testing the modules, including using beam in upcoming CPP/PrimEx runs
      • Build 5x5 stack?
  • Arshak working on LMS
    • Contacted Carl Zorn regarding using his setup for checking transmission of light through plexiglas sheet -- equipment not working yet
  • Igal described student project 5 for dark matter searches
  • Azizah showed photon gun reconstruction efficiency as a function of φ
    • Holes at 0, 180 degrees probably due to gap between crystals