Difference between revisions of "JEF meeting, March 11, 2022"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 6: | Line 6: | ||
* Preparation for mass production of FCAL2 modules -- Sasha | * Preparation for mass production of FCAL2 modules -- Sasha | ||
− | ** DSG has preshaped about 300 ESR foils. Started wrapping crystals with the ESR and Tedlar (first 10 modules wrapped) | + | ** DSG has preshaped about 300 ESR foils. Started wrapping crystals with the ESR and Tedlar (first 10 modules wrapped) |
− | ** Loan agreement with the GWU was submitted for signatures. Two fixtures for silicon cookies were ordered. Olga is planning to come to Jlab on March 21 | + | ** Loan agreement with the GWU was submitted for signatures. Two fixtures for silicon cookies were ordered. Olga is planning to come to Jlab on March 21 |
** Chris continues brazing brass strap assemblies | ** Chris continues brazing brass strap assemblies | ||
− | ** Bobby has started working on honing soft iron PMT housing (quite a few mu-metal cylinders don't fit into PMT housings) | + | ** Bobby has started working on honing soft iron PMT housing (quite a few mu-metal cylinders don't fit into PMT housings) |
** Igal is cutting Tedlar, Kapton, and ESR foils. | ** Igal is cutting Tedlar, Kapton, and ESR foils. | ||
* Module fabrication -- Sasha | * Module fabrication -- Sasha |
Revision as of 00:46, 11 March 2022
Meeting time and location
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Preparation for mass production of FCAL2 modules -- Sasha
- DSG has preshaped about 300 ESR foils. Started wrapping crystals with the ESR and Tedlar (first 10 modules wrapped)
- Loan agreement with the GWU was submitted for signatures. Two fixtures for silicon cookies were ordered. Olga is planning to come to Jlab on March 21
- Chris continues brazing brass strap assemblies
- Bobby has started working on honing soft iron PMT housing (quite a few mu-metal cylinders don't fit into PMT housings)
- Igal is cutting Tedlar, Kapton, and ESR foils.
- Module fabrication -- Sasha
- Light Monitoring System
- COMCAL tests, TAC running, etc.
- Data analysis
- Simulations
- FCAL2 Insert Efficiency in Phi -- Azizah