Difference between revisions of "JEF meeting, March 11, 2022"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 13: Line 13:
 
* Module fabrication  -- Sasha
 
* Module fabrication  -- Sasha
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf  Modules fabricated by Arshak and Sasha] [https://docs.google.com/document/d/1upI9M_RNR4qipzwg-SmxmzkqoCDU294x7Y3jT5M6DVY/edit (list on Google Drive)] (grand total 144)
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf  Modules fabricated by Arshak and Sasha] [https://docs.google.com/document/d/1upI9M_RNR4qipzwg-SmxmzkqoCDU294x7Y3jT5M6DVY/edit (list on Google Drive)] (grand total 144)
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/2_17_22/fab_mod_2_17_22.jpg Fabricated modules in TEDF ]
+
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/3_11_22 Fabricated modules in TEDF ]
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf  Status of fabrication ]
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf  Status of fabrication ]
 
* Light Monitoring System
 
* Light Monitoring System

Revision as of 10:26, 11 March 2022

Meeting time and location

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

  • Preparation for mass production of FCAL2 modules -- Sasha
    • DSG has preshaped about 300 ESR foils. Started wrapping crystals with the ESR and Tedlar (first 10 modules wrapped)
    • Loan agreement with the GWU was submitted for signatures. Two fixtures for silicon cookies were ordered. Olga is planning to come to Jlab on March 21
    • Chris continues brazing brass strap assemblies
    • Bobby has started working on honing soft iron PMT housing (quite a few mu-metal cylinders don't fit into PMT housings)
    • Igal is cutting Tedlar, Kapton, and ESR foils
  • Module fabrication -- Sasha
  • Light Monitoring System
  • COMCAL tests, TAC running, etc.
  • Data analysis
  • Simulations