Difference between revisions of "JEF meeting, March 18, 2022"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 8: | Line 8: | ||
** DSG: Continues to preshape ESR foils (80 per week) and wrap crystals with the ESR and Tedlar (5-8 modules a day) | ** DSG: Continues to preshape ESR foils (80 per week) and wrap crystals with the ESR and Tedlar (5-8 modules a day) | ||
** Igal started cutting ESR foils needed by the DSG | ** Igal started cutting ESR foils needed by the DSG | ||
− | ** Loan agreement with the GWU has been signed. Olga | + | ** Loan agreement with the GWU has been signed. Olga will come come in the beginning of next week (will work on checking PMT diameter and produce siliicon cookies); will take equipment to the GWU. |
* Module fabrication -- Sasha | * Module fabrication -- Sasha | ||
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] |
Revision as of 22:09, 17 March 2022
Meeting time and location
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Preparation for mass production of FCAL2 modules -- Sasha
- DSG: Continues to preshape ESR foils (80 per week) and wrap crystals with the ESR and Tedlar (5-8 modules a day)
- Igal started cutting ESR foils needed by the DSG
- Loan agreement with the GWU has been signed. Olga will come come in the beginning of next week (will work on checking PMT diameter and produce siliicon cookies); will take equipment to the GWU.
- Module fabrication -- Sasha
- Light Monitoring System
- COMCAL tests, TAC running, etc.
- Data analysis
- Simulations