Line 18: Line 18:
 
* '''Module fabrication'''  -- Sasha   
 
* '''Module fabrication'''  -- Sasha   
 
<!-- ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf  Status of fabrication ] -->
 
<!-- ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf  Status of fabrication ] -->
** Fabricated modules: <span style="color:#FF0000"> Total 1482 </span> (12 modules fabricated since last week)
+
** Fabricated modules: <span style="color:#FF0000"> Total 1482 </span>
**: Currently available for fabrication: 0
+
**: Currently available for fabrication: 0 (modules will be available during next week)
 
<!-- *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All SICCAS 576 + 3 SICCAS] -->
 
<!-- *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication.pdf All SICCAS 576 + 3 SICCAS] -->
 
<!-- *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 834 CRYTUR], available: 1 -->
 
<!-- *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 834 CRYTUR], available: 1 -->

Revision as of 09:14, 31 March 2023

Meeting time and location:

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

  • Preparation of parts for FCAL2 modules -- Sasha
    • Available crystals:
      1450 (modules)
      32 (ready for fabrication)
      40 (installed on CCAL) available on March 20
      (some CCAL crystals from the inner part will not be used for the FCAL2)
      95 expect to receive from CRYTUR in May [1] Expect to start shipping crystals in the 2nd week of April.
      Total 1617
    • Disassemble the CCAL prototype
    • George (DSG group) is unwrapping CCAL modules and removing LMS caps. He'll also work on preshaping ESR reflectors (100 pcs) for CRYTUR.
    • Mindy (DSG group) solder wires to sockets (while waiting for crystals). She will continue with crystal wrapping during next week.
  • Module fabrication -- Sasha
    • Fabricated modules: Total 1482
      Currently available for fabrication: 0 (modules will be available during next week)
  • Testing of PMT dividers -- Sasha / Arshak
    • FCAL2 modules with dividers installed on the CCAL [2]
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Arshak
  • Light Monitoring System -- Arshak
  • Simulations/Analysis