* '''Module fabrication''' -- Sasha | * '''Module fabrication''' -- Sasha | ||
<!-- ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] --> | <!-- ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] --> | ||
− | ** Fabricated modules: <span style="color:#FF0000"> Total | + | ** Fabricated modules: <span style="color:#FF0000"> Total 1542 </span> |
− | **: | + | **: 9 modules fabricated during last week <!-- [[File:Fab_mod_may_2023.jpg]] --> |
− | **: Available for fabrication: | + | **: Available for fabrication: 26 |
**: 42 modules fabricated using 'low quality' crystals for the stacking mockup and 'crunch' tests. | **: 42 modules fabricated using 'low quality' crystals for the stacking mockup and 'crunch' tests. | ||
** [https://docs.google.com/presentation/d/18Awobg1SA4b71q87fH1zgfFw8CjoUXUvET_VIy279fI/edit?usp=sharing Report from students] | ** [https://docs.google.com/presentation/d/18Awobg1SA4b71q87fH1zgfFw8CjoUXUvET_VIy279fI/edit?usp=sharing Report from students] |
Revision as of 08:51, 19 May 2023
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
Agenda
- Preparation of parts for FCAL2 modules -- Sasha
- Crystals:
- Received 40 crystals from CRYTUR [1], 10 have been recently sent out. Remaining 45 crystals.
- Wrapped crystals: 10
- Available for wrapping: 10 SICCAS + 5 CRYTUR = 15
- George (DSG group) finished with preshaping.
- More than 400 long signal cables received, can start checking, bundling, labeling (receive labeling machine in a couple of weeks)
- Procurement parts for the LMS
- 16,400 ft of optical fibers delivered to the lab. 7,600 will be delivered in September.
- Receive first batch of donats for the LMS, evrth. looks Ok. Will receive all of them in a couple of weeks (start working on the LMS)
- Crystals:
- Module fabrication -- Sasha
- Fabricated modules: Total 1542
- 9 modules fabricated during last week
- Available for fabrication: 26
- 42 modules fabricated using 'low quality' crystals for the stacking mockup and 'crunch' tests.
- Report from students
- Fabricated modules: Total 1542
- Testing of PMT dividers -- Sasha / Vlad / Arshak
- FCAL2 modules with dividers installed on the CCAL [2]
- Met with Vlad P. on Tuesday. Fine tuned the divider circuit. Checking/tuning an amplifier; Chris S. ordered some OPS.
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Arshak
- Detector installation page
- Updates from the meetings with Tim's group [3]
- Discussion of the FCAL2 installation procedures [4]
- Final mapping of low-voltage cables
- Manpower and division of tasks
- Projects for summer students
- Summer Students (2023)
- Simulations/Analysis