Difference between revisions of "JEF meeting, October 28, 2022"
From GlueXWiki
Line 18: | Line 18: | ||
*** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 737 CRYTUR], available: 25 | *** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/module_fabrication_crytur.pdf 737 CRYTUR], available: 25 | ||
* Updates from the FCAL installation meetings with Tim's group -- Sasha | * Updates from the FCAL installation meetings with Tim's group -- Sasha | ||
− | ** [https://halldweb.jlab.org/wiki/index.php/October_26,_2022_FCAL_Insert_Cable_Installation_Meeting October | + | ** [https://halldweb.jlab.org/wiki/index.php/October_26,_2022_FCAL_Insert_Cable_Installation_Meeting October 26] |
** [https://halldweb.jlab.org/wiki/index.php/FCAL_2_Design_Meetings Link to the earlier design meetings] | ** [https://halldweb.jlab.org/wiki/index.php/FCAL_2_Design_Meetings Link to the earlier design meetings] | ||
* Light Monitoring System -- Arshak | * Light Monitoring System -- Arshak |
Revision as of 09:08, 28 October 2022
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Simulations/Analysis
- Preparation of parts for FCAL2 modules -- Sasha
- Order 25 CRYTUR crystals (Total 1613 + 25 = 1638)
- Wrapped CRYTUR crystals: 727
- Available for wrapping: 762 - 727 = 25
- DSG group continues wrapping
- List of available parts
- Module fabrication -- Sasha
- Status of fabrication
- Fabricated modules: Total 1313 (5 modules fabricated since last week)
- All SICCAS 576 SICCAS
- 737 CRYTUR, available: 25
- Updates from the FCAL installation meetings with Tim's group -- Sasha
- Light Monitoring System -- Arshak