Difference between revisions of "JEF meeting, October 28, 2022"

From GlueXWiki
Jump to: navigation, search
(Minutes)
Line 25: Line 25:
 
=Minutes=
 
=Minutes=
  
* 25 CRYTUR crystals have be ordered (the PR signed)
+
* 25 CRYTUR crystals have been ordered (the PR signed)
 
* Continue wrapping CRYTUR crystals (Mindy) - 10 done during last week. 25 crystals are available for wrapping, expect to receive 50 new crystals from CRYTUR in November.
 
* Continue wrapping CRYTUR crystals (Mindy) - 10 done during last week. 25 crystals are available for wrapping, expect to receive 50 new crystals from CRYTUR in November.
 
* Fabricated 10 more modules, the grand total is 1313   
 
* Fabricated 10 more modules, the grand total is 1313   
 
* Meeting with the DSG group will be scheduled during next week. We'll discuss the group involvement in the project during the FCAL2 installation phase.
 
* Meeting with the DSG group will be scheduled during next week. We'll discuss the group involvement in the project during the FCAL2 installation phase.
 
* We had a regular meeting with Tim's group on Wednesday this week. We discussed cabling of the FCAL2 and patch panels of the FCAL insert. There is some tentative agreement regarding rearranging cables from the inner part of the FCAL and their connections to VXS crates (we'll discuss more details during next JEF meeting).
 
* We had a regular meeting with Tim's group on Wednesday this week. We discussed cabling of the FCAL2 and patch panels of the FCAL insert. There is some tentative agreement regarding rearranging cables from the inner part of the FCAL and their connections to VXS crates (we'll discuss more details during next JEF meeting).

Revision as of 11:45, 28 October 2022

Meeting time and location:

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

Minutes

  • 25 CRYTUR crystals have been ordered (the PR signed)
  • Continue wrapping CRYTUR crystals (Mindy) - 10 done during last week. 25 crystals are available for wrapping, expect to receive 50 new crystals from CRYTUR in November.
  • Fabricated 10 more modules, the grand total is 1313
  • Meeting with the DSG group will be scheduled during next week. We'll discuss the group involvement in the project during the FCAL2 installation phase.
  • We had a regular meeting with Tim's group on Wednesday this week. We discussed cabling of the FCAL2 and patch panels of the FCAL insert. There is some tentative agreement regarding rearranging cables from the inner part of the FCAL and their connections to VXS crates (we'll discuss more details during next JEF meeting).