Difference between revisions of "JEF meeting, October 28, 2022"

From GlueXWiki
Jump to: navigation, search
(Minutes)
(Agenda)
Line 21: Line 21:
 
** [https://halldweb.jlab.org/wiki/index.php/October_26,_2022_FCAL_Insert_Cable_Installation_Meeting October 26]
 
** [https://halldweb.jlab.org/wiki/index.php/October_26,_2022_FCAL_Insert_Cable_Installation_Meeting October 26]
 
** [https://halldweb.jlab.org/wiki/index.php/FCAL_2_Design_Meetings Link to the earlier design meetings]
 
** [https://halldweb.jlab.org/wiki/index.php/FCAL_2_Design_Meetings Link to the earlier design meetings]
 +
* [https://halldweb.jlab.org/wiki/index.php/List_of_tasks_and_manpower Meeting with the detector support group]
 
* Light Monitoring System -- Arshak
 
* Light Monitoring System -- Arshak
  

Revision as of 18:50, 3 November 2022

Meeting time and location:

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

Minutes

  • 25 CRYTUR crystals have been ordered (the PR signed)
  • Continue wrapping CRYTUR crystals (Mindy) - 10 done during last week. 25 crystals are available for wrapping, expect to receive 50 new crystals from CRYTUR in November.
  • Fabricated 10 more modules, the grand total is 1313
  • Meeting with the DSG group will be scheduled during next week. We'll discuss the group involvement in the project during the FCAL2 installation phase.
  • We had a regular meeting with Tim's group on Wednesday this week. We discussed cabling of the FCAL2 and patch panels of the FCAL insert. There is some tentative agreement regarding rearranging cables from the inner part of the FCAL and their connections to VXS crates. More details will be discussed during next meeting with Tim (and JEF meeting)