Difference between revisions of "JEF meeting, October 28, 2022"

From GlueXWiki
Jump to: navigation, search
 
(13 intermediate revisions by 2 users not shown)
Line 5: Line 5:
 
=Agenda=
 
=Agenda=
  
 +
* Moving JEF hardware reports to CALWG?
 
* Simulations/Analysis
 
* Simulations/Analysis
 
*Preparation of parts for FCAL2 modules -- Sasha  
 
*Preparation of parts for FCAL2 modules -- Sasha  
 
** Order 25 CRYTUR crystals (Total 1613 + 25 = 1638)
 
** Order 25 CRYTUR crystals (Total 1613 + 25 = 1638)
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 727 ]  
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 727 ]  
*** Available for wrapping: 762 - 727 = 25  
+
*** Available for wrapping: 762 - 727 = 25 (10 crystals were wrapped during last week)
*** DSG group continues wrapping
+
*** DSG group continues wrapping (Mindy)
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf List of available parts]
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf List of available parts]
 
* Module fabrication  -- Sasha
 
* Module fabrication  -- Sasha
Line 21: Line 22:
 
** [https://halldweb.jlab.org/wiki/index.php/FCAL_2_Design_Meetings Link to the earlier design meetings]
 
** [https://halldweb.jlab.org/wiki/index.php/FCAL_2_Design_Meetings Link to the earlier design meetings]
 
* Light Monitoring System -- Arshak
 
* Light Monitoring System -- Arshak
 +
 +
=Minutes=
 +
 +
* 25 CRYTUR crystals have been ordered (the PR signed)
 +
* Continue wrapping CRYTUR crystals (Mindy) - 10 done during last week. 25 crystals are available for wrapping, expect to receive 50 new crystals from CRYTUR in November.
 +
* Fabricated 10 more modules, the grand total is 1313 
 +
* Meeting with the DSG group will be scheduled during next week. We'll discuss the group involvement in the project during the FCAL2 installation phase.
 +
* We had a regular meeting with Tim's group on Wednesday this week. We discussed cabling of the FCAL2 and patch panels of the FCAL insert. There is some tentative agreement regarding rearranging cables from the inner part of the FCAL and their connections to VXS crates. More details will be discussed during next meeting with Tim (and JEF meeting)

Latest revision as of 18:51, 3 November 2022

Meeting time and location:

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

Minutes

  • 25 CRYTUR crystals have been ordered (the PR signed)
  • Continue wrapping CRYTUR crystals (Mindy) - 10 done during last week. 25 crystals are available for wrapping, expect to receive 50 new crystals from CRYTUR in November.
  • Fabricated 10 more modules, the grand total is 1313
  • Meeting with the DSG group will be scheduled during next week. We'll discuss the group involvement in the project during the FCAL2 installation phase.
  • We had a regular meeting with Tim's group on Wednesday this week. We discussed cabling of the FCAL2 and patch panels of the FCAL insert. There is some tentative agreement regarding rearranging cables from the inner part of the FCAL and their connections to VXS crates. More details will be discussed during next meeting with Tim (and JEF meeting)