Difference between revisions of "JEF meeting, October 6, 2023"
From GlueXWiki
(Created page with "Meeting time and location: *9:30 am EST (JLab time) remote only * [https://halldweb.jlab.org/wiki-private/index.php/JEF_Weekly_Meeting#Connection_information Connection inform...") |
|||
(3 intermediate revisions by one other user not shown) | |||
Line 2: | Line 2: | ||
*9:30 am EST (JLab time) remote only | *9:30 am EST (JLab time) remote only | ||
* [https://halldweb.jlab.org/wiki-private/index.php/JEF_Weekly_Meeting#Connection_information Connection information] | * [https://halldweb.jlab.org/wiki-private/index.php/JEF_Weekly_Meeting#Connection_information Connection information] | ||
+ | |||
+ | |||
=Agenda= | =Agenda= | ||
*'''Preparation of parts for ECAL modules''' -- Sasha | *'''Preparation of parts for ECAL modules''' -- Sasha | ||
+ | ** Crystals: | ||
+ | **: - Prepare to send 11 crystals back to SICCAS [https://halldweb.jlab.org/wiki/index.php/SICCAS]. | ||
+ | ** Received 1100 short signal cables [https://halldweb.jlab.org/detectors/fcal2/installation/photos/label_signal/short_signal.jpg] | ||
+ | ** Received 140 HV cables | ||
+ | ** Received all optical fibers. | ||
* '''Module fabrication''' -- Sasha | * '''Module fabrication''' -- Sasha | ||
+ | <!-- ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/fcal_fabrication.pdf Status of fabrication ] --> | ||
+ | ** All modules have been fabricated, checked, and inventorized (about 1610 modules in total) | ||
* '''Ongoing projects''' -- Sasha, all | * '''Ongoing projects''' -- Sasha, all | ||
+ | ** Visual inspections of fabricated modules [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/19_05_2023/modules_qa.docx] - done | ||
+ | ** All crystals moved to Hall D[https://halldweb.jlab.org/detectors/fcal2/installation/photos/move_to_halld/prepare_to_move.jpg] [https://halldweb.jlab.org/detectors/fcal2/installation/photos/move_to_halld/prepare_to_move1.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/photos/move_to_halld/prepare_to_move2.jpg] - done | ||
+ | ** Tested, labeled, and bundled all 100 (+ 2 spares) [https://halldweb.jlab.org/detectors/fcal2/installation/photos/label_signal/signal_bundles.jpg] signal cables connected from the flash ADC to the patch panel [https://halldweb.jlab.org/wiki/index.php/Testing_and_labeling_cables] - done | ||
+ | ** Test and label 1100 short signal cables - ongoing | ||
+ | ** Tested fabricated modules using LMS [https://halldweb.jlab.org/wiki/index.php/Testing_ECAL_modules] - done (need to update the wiki page) | ||
+ | ** Cutting optical fibers and gluing plastic caps [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/06_23_2023/glue_caps.jpg], waiting for 7600 ft of optical fibers | ||
+ | ** [https://docs.google.com/presentation/d/1euIA49SszoQmSM4Lxu1OtZ8OfjltgwzXIbXo6TPEB3s/edit#slide=id.p Report from students] | ||
+ | ** Refurbished (remove soldering bumps and rewrap) 42 modules. One more layer of the detector will be installed today. | ||
+ | ** Need to wrap and fabricate about 30 modules using newly received crystals (will replace some already existing modules with low-quality crystals). Plan to finish with this during next week [https://halldweb.jlab.org/detectors/fcal2/lms/wrapped_spares.jpg]. | ||
+ | ** Tested and labeled 120 HV cables | ||
+ | ** Preparing optical fibers for the LMS | ||
+ | :: - cut all remaining (500 ft) optical fibers [https://halldweb.jlab.org/detectors/fcal2/lms/lms_fibers1.jpg] | ||
+ | :: - glue plastic caps on all fibers [https://halldweb.jlab.org/detectors/fcal2/lms/lms_fibers2.jpg] | ||
+ | * '''[[Testing of PMT dividers]]''' -- Sasha / Vlad | ||
+ | ** - Received all divider PCBs. Preparing test setup. Will proceed with testing during next week | ||
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Arshak / Vlad / Hakob | * '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Arshak / Vlad / Hakob | ||
+ | ** Detector installation [https://logbooks.jlab.org/book/halld][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector1.jpg][https://halldweb.jlab.org/detectors/fcal2/installation/photos/install_fcal/students_detector.jpg] | ||
+ | ** [https://halldweb.jlab.org/wiki/index.php/FCAL_Installation Detector installation page] | ||
+ | ** Updates from the meetings with Tim's group [https://halldweb.jlab.org/wiki/index.php/FCAL_2_Design_Meetings] | ||
+ | ** Discussion of the FCAL2 installation procedures [https://halldweb.jlab.org/wiki/index.php/FCAL_2_Installation_Meetings] | ||
+ | ** [https://halldweb.jlab.org/wiki/index.php/Distribution_of_signals_and_voltages Final mapping of low-voltage cables] | ||
+ | ** Mindy continues with wrapping crystals and soldering wires to sockets. | ||
+ | ** [https://halldweb.jlab.org/wiki/index.php/List_of_tasks_and_manpower Projects for summer students] | ||
+ | ** [https://halldweb.jlab.org/detectors/fcal2/installation/students_2023/list_of_students_2023.xlsx Summer Students (2023) ] | ||
+ | <!-- ** [https://halldweb.jlab.org/detectors/fcal2/installation/photos Disassembling FCAL] --> | ||
* '''Light monitoring system''' -- Arshak | * '''Light monitoring system''' -- Arshak | ||
*'''Analysis/Simulation''' | *'''Analysis/Simulation''' | ||
+ | |||
+ | =Minutes= | ||
+ | Attendees: Phil, Igal, Zisis, Liping, Sasha, Vlad, Jane, Jon, Olga, S.T. | ||
+ | * All remaining optical fibers have been cut and donuts attached | ||
+ | ** Still need polishing; Sasha to get driver from Arshak to use polishing machine | ||
+ | ** Design for LMS installation to be finalized within about a week | ||
+ | * Received all PCBs for PMT dividers | ||
+ | ** Will proceed with attaching sockets | ||
+ | ** Each PMT divider will need to be checked | ||
+ | * Installation of FCAL2 modules almost done, only 3 rows remain | ||
+ | ** Found and put aside 2 modules with lost PMT vacuum | ||
+ | * Sasha working on keeping detector support group involved, also hope to get help from fast electronics group | ||
+ | *Liping's proposal for symposium at April APS meeting was approved |
Latest revision as of 13:14, 6 October 2023
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- Preparation of parts for ECAL modules -- Sasha
- Module fabrication -- Sasha
- All modules have been fabricated, checked, and inventorized (about 1610 modules in total)
- Ongoing projects -- Sasha, all
- Visual inspections of fabricated modules [3] - done
- All crystals moved to Hall D[4] [5][6] - done
- Tested, labeled, and bundled all 100 (+ 2 spares) [7] signal cables connected from the flash ADC to the patch panel [8] - done
- Test and label 1100 short signal cables - ongoing
- Tested fabricated modules using LMS [9] - done (need to update the wiki page)
- Cutting optical fibers and gluing plastic caps [10], waiting for 7600 ft of optical fibers
- Report from students
- Refurbished (remove soldering bumps and rewrap) 42 modules. One more layer of the detector will be installed today.
- Need to wrap and fabricate about 30 modules using newly received crystals (will replace some already existing modules with low-quality crystals). Plan to finish with this during next week [11].
- Tested and labeled 120 HV cables
- Preparing optical fibers for the LMS
- Testing of PMT dividers -- Sasha / Vlad
- - Received all divider PCBs. Preparing test setup. Will proceed with testing during next week
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Arshak / Vlad / Hakob
- Detector installation [14][15][16]
- Detector installation page
- Updates from the meetings with Tim's group [17]
- Discussion of the FCAL2 installation procedures [18]
- Final mapping of low-voltage cables
- Mindy continues with wrapping crystals and soldering wires to sockets.
- Projects for summer students
- Summer Students (2023)
- Light monitoring system -- Arshak
- Analysis/Simulation
Minutes
Attendees: Phil, Igal, Zisis, Liping, Sasha, Vlad, Jane, Jon, Olga, S.T.
- All remaining optical fibers have been cut and donuts attached
- Still need polishing; Sasha to get driver from Arshak to use polishing machine
- Design for LMS installation to be finalized within about a week
- Received all PCBs for PMT dividers
- Will proceed with attaching sockets
- Each PMT divider will need to be checked
- Installation of FCAL2 modules almost done, only 3 rows remain
- Found and put aside 2 modules with lost PMT vacuum
- Sasha working on keeping detector support group involved, also hope to get help from fast electronics group
- Liping's proposal for symposium at April APS meeting was approved