Difference between revisions of "JEF meeting, September 11, 2020"

From GlueXWiki
Jump to: navigation, search
 
Line 29: Line 29:
 
* GlueX/JEF PAC presentation
 
* GlueX/JEF PAC presentation
 
: -[https://halldweb.jlab.org/JEF/pac_review.pptx Draft of FCAL2 upgrade slides]
 
: -[https://halldweb.jlab.org/JEF/pac_review.pptx Draft of FCAL2 upgrade slides]
 +
 +
=Minutes=
 +
Attendees:  Josh, Liping, Jared, Phil, Jane, Zisis, Susan, Matt S., Sasha, Arshak, Jon, Bill B.
 +
* We went over Liping's and Sasha's slides prepared for the PAC jeopardy presentation with Matt.
 +
** Matt will condense these to a few (PAC guidance is 20 minutes total for GlueX/JEF/DIRC presentation)
 +
** Emphasis should be on broadening JEF physics scope and FCAL-II upgrade updates
 +
** How to handle the possibility that there will be less than 100 days (original JEF beam request) left when FCAL-II on the floor?
 +
*** Thought is that if we need to, we will go to back to the PAC to ask for additional beam time
 +
* Another set of "good" crystals has been installed in the PS setup in the Hall
 +
** Relative amplitudes show 15-20% variation, all look good
 +
** Next: install several crystals with internal imperfections (bubbles, internal structures)
 +
* SICCAS to finish next batch of crystals in near future -- delivery in October?
 +
* Progress continues with PMT divider redesign -- 3 modified bases have been installed in COMCAL
 +
** Once design finalized, plane to order enough to refurbish whole CCAL for PrimeX
 +
* Jared working with Phil and Igal on signal PDFs for dark matter searches, may present next week?

Latest revision as of 07:48, 14 September 2020

Meeting time and location= 9:30 am EST (JLab time) Bluejeans only


Connection instructions

We are using BlueJeans Video/Audio conferencing. Our meeting ID number is 992533564. Click "Expand" for more details.

  • Make sure you have created a BlueJeans account via your JLab CUE account using this link:
  • If connecting via Web Browser: click this link (no passcode is needed):
  • If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
  • If connecting via Polycom unit:
    • Dial 199.48.152.152 or bjn.vc
    • Enter meeting ID above

Agenda

  • SICCAS crystals
-PS test 6 [1]
-New dividers installed [2]
  • Simulations
  • GlueX/JEF PAC presentation
-Draft of FCAL2 upgrade slides

Minutes

Attendees: Josh, Liping, Jared, Phil, Jane, Zisis, Susan, Matt S., Sasha, Arshak, Jon, Bill B.

  • We went over Liping's and Sasha's slides prepared for the PAC jeopardy presentation with Matt.
    • Matt will condense these to a few (PAC guidance is 20 minutes total for GlueX/JEF/DIRC presentation)
    • Emphasis should be on broadening JEF physics scope and FCAL-II upgrade updates
    • How to handle the possibility that there will be less than 100 days (original JEF beam request) left when FCAL-II on the floor?
      • Thought is that if we need to, we will go to back to the PAC to ask for additional beam time
  • Another set of "good" crystals has been installed in the PS setup in the Hall
    • Relative amplitudes show 15-20% variation, all look good
    • Next: install several crystals with internal imperfections (bubbles, internal structures)
  • SICCAS to finish next batch of crystals in near future -- delivery in October?
  • Progress continues with PMT divider redesign -- 3 modified bases have been installed in COMCAL
    • Once design finalized, plane to order enough to refurbish whole CCAL for PrimeX
  • Jared working with Phil and Igal on signal PDFs for dark matter searches, may present next week?