Difference between revisions of "JEF meeting, September 29, 2023"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 8: Line 8:
 
**: - Prepare to send 11 crystals back to SICCAS  [https://halldweb.jlab.org/wiki/index.php/SICCAS].  
 
**: - Prepare to send 11 crystals back to SICCAS  [https://halldweb.jlab.org/wiki/index.php/SICCAS].  
 
** Received 1100 short signal cables [https://halldweb.jlab.org/detectors/fcal2/installation/photos/label_signal/short_signal.jpg]  
 
** Received 1100 short signal cables [https://halldweb.jlab.org/detectors/fcal2/installation/photos/label_signal/short_signal.jpg]  
 +
** Received 140 HV cables
 
** Received 24,400 ft of optical fibers.  
 
** Received 24,400 ft of optical fibers.  
 
* '''Module fabrication'''  -- Sasha   
 
* '''Module fabrication'''  -- Sasha   

Revision as of 09:20, 29 September 2023

Meeting time and location:

Agenda

  • Preparation of parts for ECAL modules -- Sasha
    • Crystals:
      - Prepare to send 11 crystals back to SICCAS [1].
    • Received 1100 short signal cables [2]
    • Received 140 HV cables
    • Received 24,400 ft of optical fibers.
  • Module fabrication -- Sasha
    • All modules have been fabricated, checked, and inventorized (about 1610 modules in total)
  • Ongoing projects -- Sasha, all
    • Visual inspections of fabricated modules [3] - done
    • All crystals moved to Hall D[4] [5][6] - done
    • Tested, labeled, and bundled all 100 (+ 2 spares) [7] signal cables connected from the flash ADC to the patch panel [8] - done
    • Test and label 1100 short signal cables - ongoing
    • Tested fabricated modules using LMS [9] - done (need to update the wiki page)
    • Cutting optical fibers and gluing plastic caps [10], waiting for 7600 ft of optical fibers
    • Report from students
    • Refurbished (remove soldering bumps and rewrap) 42 modules. One more layer of the detector will be installed today.
    • Need to wrap and fabricate about 30 modules using newly received crystals (will replace some already existing modules with low-quality crystals). Plan to finish with this during next week.
    • Preparing optical fibers for the LMS
  • Testing of PMT dividers -- Sasha / Vlad
    • -Tested 6 dividers from the first batch. Asked to produce all remaining dividers. Expect to receive some of them in a couple of weeks
  • Proceedures
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Arshak / Vlad / Hakob
  • Light monitoring system -- Arshak
  • Analysis/Simulation