Difference between revisions of "Jan 10, 2013 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
(Action Items from previous meetings)
(Action Items from previous meetings)
Line 2: Line 2:
  
 
# Check that we have all RTDs already, otherwise order (Chris)
 
# Check that we have all RTDs already, otherwise order (Chris)
 +
# Jim to send BOM for mechanical parts to Chris. Chris to decide on type and size of bins needed to hold sorted parts.
  
 
== Tentative Agenda ==
 
== Tentative Agenda ==

Revision as of 17:24, 6 December 2012

Action Items from previous meetings

  1. Check that we have all RTDs already, otherwise order (Chris)
  2. Jim to send BOM for mechanical parts to Chris. Chris to decide on type and size of bins needed to hold sorted parts.

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule for production and testing (all)
  4. mini-Bcal (Elton)
  5. SiPM production testing (Yi)
  6. Mechanical assembly (Jim)
  7. Temperature compensation (Jack)
  8. Electronic boards (Fernando and Chris)
  9. Light guide gluing setup (Scot)

Minutes

Attending: