Difference between revisions of "Jan 10, 2013 SiPM Electrical and Cooling"
From GlueXWiki
(→Action Items from previous meetings) |
(→Action Items from previous meetings) |
||
Line 3: | Line 3: | ||
# Check that we have all RTDs already, otherwise order (Chris) | # Check that we have all RTDs already, otherwise order (Chris) | ||
# Jim to send BOM for mechanical parts to Chris. Chris to decide on type and size of bins needed to hold sorted parts. | # Jim to send BOM for mechanical parts to Chris. Chris to decide on type and size of bins needed to hold sorted parts. | ||
+ | # Confirm with Fernando that the labeling of boards U1-U48 and D1-D48 is ok (Elton) | ||
# Make decisions on how to treat sensors with high dark rate (Elton) | # Make decisions on how to treat sensors with high dark rate (Elton) | ||
Revision as of 17:47, 6 December 2012
Action Items from previous meetings
- Check that we have all RTDs already, otherwise order (Chris)
- Jim to send BOM for mechanical parts to Chris. Chris to decide on type and size of bins needed to hold sorted parts.
- Confirm with Fernando that the labeling of boards U1-U48 and D1-D48 is ok (Elton)
- Make decisions on how to treat sensors with high dark rate (Elton)
Tentative Agenda
- Announcements
- Action Items
- Schedule for production and testing (all)
- mini-Bcal (Elton)
- SiPM production testing (Yi)
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Fernando and Chris)
- Light guide gluing setup (Scot)
Minutes
Attending: