Difference between revisions of "Jan 10, 2013 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
(Action Items from previous meetings)
Line 1: Line 1:
 
== Action Items from previous meetings ==
 
== Action Items from previous meetings ==
  
# Check that we have all RTDs already, otherwise order (Chris)
+
# <strike> Check that we have all RTDs already, otherwise order (Chris) </strike> Chris found the box of 100 that Jim had ordered.
 
# <strike> Jim to send BOM for mechanical parts to Chris. Chris to decide on type and size of bins needed to hold sorted parts. </strike>
 
# <strike> Jim to send BOM for mechanical parts to Chris. Chris to decide on type and size of bins needed to hold sorted parts. </strike>
 
# <strike> Confirm with Fernando that the labeling of boards U1-U48 and D1-D48 is ok (Elton) </strike>
 
# <strike> Confirm with Fernando that the labeling of boards U1-U48 and D1-D48 is ok (Elton) </strike>

Revision as of 17:04, 10 January 2013

Action Items from previous meetings

  1. Check that we have all RTDs already, otherwise order (Chris) Chris found the box of 100 that Jim had ordered.
  2. Jim to send BOM for mechanical parts to Chris. Chris to decide on type and size of bins needed to hold sorted parts.
  3. Confirm with Fernando that the labeling of boards U1-U48 and D1-D48 is ok (Elton)
  4. Make decisions on how to treat sensors with high dark rate (Elton) They satisfy our specifications. Use along with others.

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule for production and testing (all)
  4. mini-Bcal (Elton)
  5. SiPM production testing (Yi)
  6. Mechanical assembly (Jim)
  7. Temperature compensation (Jack)
  8. Electronic boards (Fernando and Chris)
  9. Light guide gluing setup (Scot)

Minutes

Attending: