Jan 10, 2013 SiPM Electrical and Cooling

From GlueXWiki
Revision as of 17:00, 10 January 2013 by Elton (Talk | contribs)

Jump to: navigation, search

Action Items from previous meetings

  1. Check that we have all RTDs already, otherwise order (Chris)
  2. Jim to send BOM for mechanical parts to Chris. Chris to decide on type and size of bins needed to hold sorted parts.
  3. Confirm with Fernando that the labeling of boards U1-U48 and D1-D48 is ok (Elton)
  4. Make decisions on how to treat sensors with high dark rate (Elton) They satisfy our specifications. Use along with others.

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule for production and testing (all)
  4. mini-Bcal (Elton)
  5. SiPM production testing (Yi)
  6. Mechanical assembly (Jim)
  7. Temperature compensation (Jack)
  8. Electronic boards (Fernando and Chris)
  9. Light guide gluing setup (Scot)

Minutes

Attending: