(Created page with "== Meeting Time and Place == Friday Dec 6, 2019 at 2pm At Jefferson Lab, room TED 2504 == Agenda == * ESH&Q minute - ** Workers Safety Committee - Keith ** New rules for...")
 
(Agenda)
 
(6 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
== Meeting Time and Place ==
 
== Meeting Time and Place ==
  
Friday Dec 6, 2019 at 2pm
+
Friday Jan 10, 2020 at 2pm
 
At Jefferson Lab, room TED 2504
 
At Jefferson Lab, room TED 2504
 
  
 
== Agenda ==
 
== Agenda ==
 
* ESH&Q minute -   
 
* ESH&Q minute -   
** Workers Safety Committee - Keith  
+
** Workers Safety Committee/safety Warden - Keith  
 
** New rules for working on Electrical equipment
 
** New rules for working on Electrical equipment
 
*** Checklist Required (Class and Mode)
 
*** Checklist Required (Class and Mode)
Line 13: Line 12:
  
 
* Training
 
* Training
** Property
+
** Security Awareness
** General Access
+
** Physics division work governance
 +
* Group Organization
 +
* EIC Project - BNL
 
* Budget - Continuing resolution 90% of last years monthly charges
 
* Budget - Continuing resolution 90% of last years monthly charges
* Accelerator Status - Run through Dec 19, 6am, start up Jan 10, 2020- May 2020, down until Jan 2021
+
* Accelerator Status - Run through May 2020, down until Jan 2021
 
** [[Media:Accel_schedule.pdf]]
 
** [[Media:Accel_schedule.pdf]]
 
** 2021 and 2022, run Jan - Sept straight
 
** 2021 and 2022, run Jan - Sept straight
* What needs to be done in the meantime?  
+
* What was done the past month?  
** Dec 9-13  Move GEM 2 more times (Solenoid at 1350A)
+
** Moved GEM 2 more times (Solenoid at 1350A)
** Dec 10  Install BR Crystal testing station and check out PS magnet
+
** Moved GEM to US platform BL
** Dec 18  Ramp down Solenoid? and Separate FCAL platform and Install Halo Shield on TOF
+
** Installed BR Crystal testing station  
** Dec 19  Remove GEM from DIRC Platform and install BL DS of PS
+
** Acid flush PS magnet PS
** Dec 20  Prepare Hall for vacation
+
** Shutdown HCO
** Jan 7-10 Couple FCAL platform and prepare Hall for beam (some subset of HCO TBD)
+
** Acceptance HCO
** Continue FCAL Insert Design (Keith H)
+
** Move Aerogel detector
 +
** Survey and align Aerogel and crystal setups
 +
* Work during the spring run
 +
** Towards end of run Separate FCAL platform and Install CPP Halo Shield on TOF (maybe)
 +
** Modify CPP Halo Shield
 +
** Continue FCAL Insert Design (Keith H) [[Media:FCAL Insert Module installation procedure.pdf]] [[Media:FCAL2 cross section.jpg]]
 
** Start CPP Design  [[Media:CPP_Concept.pdf]]
 
** Start CPP Design  [[Media:CPP_Concept.pdf]]
* Hot Check Out https://accweb.acc.jlab.org/hco/checklists
 
 
* Hall D operations  https://halldweb.jlab.org/hdops/wiki/index.php/Information_for_Experts
 
* Hall D operations  https://halldweb.jlab.org/hdops/wiki/index.php/Information_for_Experts
 
* Hall D Maintenance Log  https://halldweb.jlab.org/cgi-bin/maintenance/cgi/status.pl
 
* Hall D Maintenance Log  https://halldweb.jlab.org/cgi-bin/maintenance/cgi/status.pl

Latest revision as of 14:53, 10 January 2020

Meeting Time and Place

Friday Jan 10, 2020 at 2pm At Jefferson Lab, room TED 2504

Agenda

  • ESH&Q minute -
    • Workers Safety Committee/safety Warden - Keith
    • New rules for working on Electrical equipment
      • Checklist Required (Class and Mode)
      • Log entry or HDLisT required

Offsite Meeting