Difference between revisions of "Jan 19, 2011 SiPM Electrical and Cooling"
From GlueXWiki
(Created page with "== Action Items from previous meetings == # U-boards need to be ordered for the mini-Bcal (Chris) # Cables need to be ordered for the SiPM production test setup (Chris) # Values...") |
(→Action Items from previous meetings) |
||
Line 1: | Line 1: | ||
== Action Items from previous meetings == | == Action Items from previous meetings == | ||
− | |||
− | |||
# Values of trim resistors for nominal operation to Chris (Jack). Chris to add them to the BOM. | # Values of trim resistors for nominal operation to Chris (Jack). Chris to add them to the BOM. | ||
− | |||
== Tentative Agenda == | == Tentative Agenda == |
Revision as of 18:34, 12 January 2012
Action Items from previous meetings
- Values of trim resistors for nominal operation to Chris (Jack). Chris to add them to the BOM.
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (everyone)
- Mechanical assembly (Scot)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Temperature compensation (Jack)
- Preamp-summing (Fernando/Chris)
- SiPM testing (Ivan)
Minutes
Attending: