== Action Items from previous meetings == | == Action Items from previous meetings == | ||
− | # Values of trim resistors for nominal operation to Chris (Jack). Chris to add them to the BOM. | + | # <strike> Values of trim resistors for nominal operation to Chris (Jack). Chris to add them to the BOM. </strike> |
== Tentative Agenda == | == Tentative Agenda == |
Revision as of 19:08, 18 January 2012
Action Items from previous meetings
-
Values of trim resistors for nominal operation to Chris (Jack). Chris to add them to the BOM.
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (everyone)
- Mechanical assembly (Scot)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Temperature compensation (Jack)
- Preamp-summing (Fernando/Chris)
- SiPM testing (Ivan)
Minutes
Attending: