Jan 19, 2011 SiPM Electrical and Cooling

From GlueXWiki
Revision as of 19:10, 18 January 2012 by Elton (Talk | contribs) (Tentative Agenda)

Jump to: navigation, search

Action Items from previous meetings

  1. Values of trim resistors for nominal operation to Chris (Jack). Chris to add them to the BOM.

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM production testing (everyone)
  5. Mechanical assembly (Scot)
  6. Mechanical (Jim)
  7. Mechanical drawings (Chuck)
  8. Temperature compensation (Jack)
  9. Preamp-summing (Fernando/Chris)
  10. SiPM testing (Ivan)

Minutes

Attending: