Difference between revisions of "Jan 3, 2012 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Items for followup from previous meeting(s))
Line 17: Line 17:
  
 
# Monitoring
 
# Monitoring
#* Send additional SiPMs to Athens for tests (Elton)
+
#* Send additional SiPMs to Athens for tests (Elton). Electronics is being prepared, should be ready by next week sometime.
 
#* <strike> Measure stability of light intensity as a function of time. </strike>
 
#* <strike> Measure stability of light intensity as a function of time. </strike>
 
#* <strike> Jlab to generate a drawing of the plexiglass sheet to be used in next batch of tests. </strike>
 
#* <strike> Jlab to generate a drawing of the plexiglass sheet to be used in next batch of tests. </strike>
 
# FCAL
 
# FCAL
#* Send IU the drawings for the FCAL welded frame. (Tim)
+
#* <strike> Send IU the drawings for the FCAL welded frame. (Tim) </strike> Drawings are being signed today and will be forwarded to IU.
  
 
= Tentative Agenda =
 
= Tentative Agenda =

Revision as of 13:02, 3 January 2012

Teleconference Time: 11:00 a.m. EST'

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • Phone connection only upon request.
    • +1-866-740-1260 : US+Canada
    • +1-303-248-0285 : International
    • then enter participant code: 3421244# (remember the "#").
    • or www.readytalk.com (and code without the #)

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6337 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947

Items for followup from previous meeting(s)

  1. Monitoring
    • Send additional SiPMs to Athens for tests (Elton). Electronics is being prepared, should be ready by next week sometime.
    • Measure stability of light intensity as a function of time.
    • Jlab to generate a drawing of the plexiglass sheet to be used in next batch of tests.
  2. FCAL
    • Send IU the drawings for the FCAL welded frame. (Tim) Drawings are being signed today and will be forwarded to IU.

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Monitoring.
  4. Beam tests in Hall B (fall 2011) (John)
  5. FCAL
    1. Construction Status: mechanical, bases (notes from Matt)
  6. BCAL
    1. Construction Status: builds, mini module
    2. Fibres
  7. USM update
    1. Production Manager Report
  8. Readiness Review: Testing of light sensors for Bcal
  9. Simulations/Reconstruction
  10. Any other business

Minutes

Attending: