Difference between revisions of "Jan 3, 2012 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Tentative Agenda)
Line 35: Line 35:
 
## Fibres
 
## Fibres
 
# USM update
 
# USM update
 +
## [https://halldweb1.jlab.org/wiki/images/3/3f/Production_manager_report_3_Jan_2012.pdf Production Manager Report]
 
# [[Readiness Review: Testing of light sensors for Bcal]]
 
# [[Readiness Review: Testing of light sensors for Bcal]]
 
# Simulations/Reconstruction
 
# Simulations/Reconstruction

Revision as of 12:22, 3 January 2012

Teleconference Time: 11:00 a.m. EST'

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • Phone connection only upon request.
    • +1-866-740-1260 : US+Canada
    • +1-303-248-0285 : International
    • then enter participant code: 3421244# (remember the "#").
    • or www.readytalk.com (and code without the #)

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6337 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947

Items for followup from previous meeting(s)

  1. Monitoring
    • Send additional SiPMs to Athens for tests (Elton)
    • Measure stability of light intensity as a function of time.
    • Jlab to generate a drawing of the plexiglass sheet to be used in next batch of tests.
  2. FCAL
    • Send IU the drawings for the FCAL welded frame. (Tim)

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Monitoring.
  4. Beam tests in Hall B (fall 2011) (John)
  5. FCAL
    1. Construction Status: mechanical, bases (notes from Matt)
  6. BCAL
    1. Construction Status: builds, mini module
    2. Fibres
  7. USM update
    1. Production Manager Report
  8. Readiness Review: Testing of light sensors for Bcal
  9. Simulations/Reconstruction
  10. Any other business

Minutes

Attending: