At Jefferson Lab, room TED 2504
 
At Jefferson Lab, room TED 2504
  
* Present -  
+
* Present - Elton Smith, David Lawrence, Rory Miskiman, Stephanie Worthington, Tim Whitlatch. Llya Larin
  
 
== Agenda ==
 
== Agenda ==
* Overall description
+
* Overall description https://halldweb.jlab.org/DocDB/0041/004180/006/CPP_update_oct19.pdf
 
* Requirements
 
* Requirements
 
* Concept [[Media:CPP Installation Concept.pdf]]
 
* Concept [[Media:CPP Installation Concept.pdf]]
 
  
 
== Minutes and Action Items ==
 
== Minutes and Action Items ==
 +
 +
* UMASS has 7 Chambers Built
 +
* Current design uses 6 chambers
 +
* Need 5cm lead US of detector
 +
* Need to determine best orientation of 1st chamber
 +
* Need 60" x 60" active area - need to optimize steel shape
 +
* Since CDC will not be used during this experiment, we can use the Ar/C02 system from that
 +
* Possible installation Fall 2021
 +
* 8cm x 8cm hole needed in steel. Can have radius in corners
 +
* If the DIRC needs to be moved out for the experiment, the CPP support needs to be able to move with the FCAL platform
 +
* Stephanie will start the 3D modelling and layouts
 +
* Tim will start the structural calculation

Latest revision as of 08:37, 27 February 2020

Meeting Time and Place =

Wednesday January 15, 2020, 2pm At Jefferson Lab, room TED 2504

  • Present - Elton Smith, David Lawrence, Rory Miskiman, Stephanie Worthington, Tim Whitlatch. Llya Larin

Agenda

Minutes and Action Items

  • UMASS has 7 Chambers Built
  • Current design uses 6 chambers
  • Need 5cm lead US of detector
  • Need to determine best orientation of 1st chamber
  • Need 60" x 60" active area - need to optimize steel shape
  • Since CDC will not be used during this experiment, we can use the Ar/C02 system from that
  • Possible installation Fall 2021
  • 8cm x 8cm hole needed in steel. Can have radius in corners
  • If the DIRC needs to be moved out for the experiment, the CPP support needs to be able to move with the FCAL platform
  • Stephanie will start the 3D modelling and layouts
  • Tim will start the structural calculation