Difference between revisions of "Jul 2, 2009 Readout"
From GlueXWiki
(→Items for followup from previous meeting) |
(→Tentative Agenda) |
||
Line 22: | Line 22: | ||
# Review of Action Items | # Review of Action Items | ||
# USM report | # USM report | ||
− | |||
# Prototyping | # Prototyping | ||
− | |||
− | |||
− | |||
# Discussion of readout options | # Discussion of readout options | ||
− | # | + | ## Costs |
− | # | + | ## Light collection |
− | # | + | ## Geometry |
# Bcal Readout Review (July 21) | # Bcal Readout Review (July 21) | ||
− | |||
− | |||
− | |||
# Simulations | # Simulations | ||
− | |||
− | |||
# Discussions on MOU with USM | # Discussions on MOU with USM | ||
= Minutes = | = Minutes = |
Revision as of 08:14, 19 June 2009
Teleconference Time: 11:00 a.m. EST
- EVO session
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Contents
Items for followup from previous meeting
- Will to propose detailed plan for prototyping for feedback. Sketch of test setup could help visualization.
- Link report to GlueX wiki (Eduardo)
- JLab to send files to import into USM cad system (Elton, Tim)
- Make progress on USM MOU document (Elton, Will, Eugene)
- MC shower 2 GeV, 20 deg but centered on 2nd cell (instead of between cells 2 and 3).
Documents to Review
Tentative Agenda
- Announcements
- Review of Action Items
- USM report
- Prototyping
- Discussion of readout options
- Costs
- Light collection
- Geometry
- Bcal Readout Review (July 21)
- Simulations
- Discussions on MOU with USM