Difference between revisions of "Jul 2, 2009 Readout"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
Line 37: Line 37:
  
 
= Minutes =
 
= Minutes =
 +
 +
# Announcements
 +
# Review of Action Items
 +
# USM report
 +
# Prototyping
 +
# Discussion of readout options
 +
## Costs
 +
## Light collection
 +
## Geometry
 +
# [http://www.jlab.org/Hall-D/guest_secure/Bcal_Readout_Jul09 Bcal Readout Review (July 21)]
 +
## Reviewers: Stefano Miscetti (INFN, via video), Stepan Stepanyan (Hall B), Howard Fenker (Hall C).
 +
## Tentative schedule: July 10: pre-brief material, July 16: slides for presentations.
 +
## pre-brief material: 1) Overview document  (Elton) 2) Relevant GlueX-docs 3) Summary of SiPMs (Carl?) 4) [http://www.jlab.org/~somov/bcal_eff.pdf MC acceptance and background] (Sasha) 4) Top level drawings?
 +
# Simulations
 +
#* [[Media:PhotonEfficiency_Jun09.pdf | Relative acceptance of SiPM and FM options]]
 +
#* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1296 GlueX-doc-1296] Contributions to the BCAL energy resolution from calibration systematics
 +
# Discussions on MOU with USM

Revision as of 13:14, 2 July 2009

Teleconference Time: 11:00 a.m. EST

  • ESNET and EVO session
  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Note participant code changed 7/2/09.

Items for followup from previous meeting

  1. Will to propose detailed plan for prototyping for feedback. Sketch of test setup could help visualization.
  2. Link report to GlueX wiki (Eduardo)
  3. JLab to send files to import into USM cad system (Elton, Tim)
  4. Make progress on USM MOU document (Elton, Will, Eugene)
  5. MC shower 2 GeV, 20 deg but centered on 2nd cell (instead of between cells 2 and 3).

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. USM report
  4. Prototyping
  5. Discussion of readout options
    1. Costs
    2. Light collection
    3. Geometry
  6. Bcal Readout Review (July 21)
    1. Reviewers: Stefano Miscetti (INFN, via video), Stepan Stepanyan (Hall B), Howard Fenker (Hall C).
    2. Tentative schedule: July 10: pre-brief material, July 16: slides for presentations.
    3. pre-brief material: 1) Overview document (Elton) 2) Relevant GlueX-docs 3) Summary of SiPMs (Carl?) 4) MC acceptance and background (Sasha) 4) Top level drawings?
  7. Simulations
  8. Discussions on MOU with USM

Minutes

  1. Announcements
  2. Review of Action Items
  3. USM report
  4. Prototyping
  5. Discussion of readout options
    1. Costs
    2. Light collection
    3. Geometry
  6. Bcal Readout Review (July 21)
    1. Reviewers: Stefano Miscetti (INFN, via video), Stepan Stepanyan (Hall B), Howard Fenker (Hall C).
    2. Tentative schedule: July 10: pre-brief material, July 16: slides for presentations.
    3. pre-brief material: 1) Overview document (Elton) 2) Relevant GlueX-docs 3) Summary of SiPMs (Carl?) 4) MC acceptance and background (Sasha) 4) Top level drawings?
  7. Simulations
  8. Discussions on MOU with USM