Difference between revisions of "Jul 24, 2012 Readout"
From GlueXWiki
m (→Tentative Agenda) |
(→Tentative Agenda) |
||
Line 41: | Line 41: | ||
# [[BCAL Beam Tests 2012]]: | # [[BCAL Beam Tests 2012]]: | ||
# Status of work at Regina | # Status of work at Regina | ||
− | ## | + | ## [[Media:20120724_bcal_simulations.pdf|BCAL hdgeant]] (David L.) |
## BCAL Cosmics at Regina | ## BCAL Cosmics at Regina | ||
# Other | # Other |
Revision as of 10:58, 24 July 2012
Teleconference Time: 11:00 a.m. EST
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- Phone connection only upon request.
- +1-866-740-1260 : US and Canada
- +1-303-248-0285 : International
- then use participant code: 3421244# (the # is needed when using the phone)
- OR from www.readytalk.com type access code 3421244 into "join a meeting" without the # (you need java plugin)
Contents
Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6337 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Videoconference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
Items for followup from previous meeting
- SiPMs
- Investigate the optimum overbias setting for the SiPMs (Serguei and Orlando)
- Understand how Orlando's data relates to the SiPM specifications (Elton et al)
- Light guides
- Send list of light guides that are out of tolerance (Iñaki)
Presentations from recent meetings
Tentative Agenda
- Announcements
- Review of Action Items
- Update from Athens: monitoring
- Update from USM
- SiPM Update (Javiera)
- Light guides (Iñaki)
- Status of testing at JLab
- Hall-D ELOG.
- Update on the analysis of the production units (Ben St. Laurent)
- Optimal bias voltage (Yi Qiang)
- BCAL Beam Tests 2012:
- Status of work at Regina
- BCAL hdgeant (David L.)
- BCAL Cosmics at Regina
- Other
Minutes
Attending: