Line 22: | Line 22: | ||
# Review of Action Items | # Review of Action Items | ||
# Update - USM | # Update - USM | ||
+ | #* Status of MOU | ||
# Simulation runs | # Simulation runs | ||
# Cosmic-ray setup at UofR | # Cosmic-ray setup at UofR | ||
− | # | + | #* Light collection tests |
# Geometry | # Geometry | ||
# [[SiPM Radiation Hardness Test]] (Update from Yi) | # [[SiPM Radiation Hardness Test]] (Update from Yi) | ||
Line 30: | Line 31: | ||
= Minutes = | = Minutes = | ||
− | Attendees: | + | Attendees:Beni, Yi, Elton (JLab); Andrei (UofR); Alam (USM). |
+ | |||
+ | # Announcements | ||
+ | #* Second shipment of Bcal modules delivered to JLab. They have been unloaded onto the parking lot. They will be transfered to the warehouse on Warwick Blvd. this afternoon. | ||
+ | # Review of Action Items | ||
+ | # Update - USM | ||
+ | #* Serguei and Will are on travel. | ||
+ | #* Light guides shipped to Regina, should arrive next week. | ||
+ | # Simulation runs | ||
+ | #* Irina will start simulation runs of energy deposition in module next week. | ||
+ | # Cosmic-ray setup at UofR | ||
+ | #* Tests are underway. Data for one point collected, and a second point taking data. No analysis yet. Measurements are being affected by power outages. | ||
+ | #* Goal is to have data at five points along the module to determine the conversion Mev/p.e. and attenuation length in the actual calorimeter module (not just bare fibers). | ||
+ | #* Expect results in August. | ||
+ | # Geometry | ||
+ | # [[SiPM Radiation Hardness Test]] (Update from Yi) | ||
+ | #* SiPM samples (1mm2 and 3mm2) are ready for testing, but awaiting Carl to return next week. They will then be irradiated using the calibrated AmBe source from RadCon, and retested. | ||
+ | #* Estimates for dark current to increase by a factor of 10 using new dose calculations by Pavel Degtiarenko from Radcon, are 1.2-1.6 years for H and 0.8-1.0 years for He at 100% running. For a "typical" year of 10^7 s, this translates into about 4 years for H and about 3 years for He. | ||
+ | #* We will plan to have a dedicated meeting the week of July 12 to review all relevant input to deciding to proceed with the SiPM procurement. | ||
+ | # Light guides |
Latest revision as of 12:10, 1 July 2010
Teleconference Time: 11:00 a.m. EST
- ESNET and EVO session
- Phone in CC L207 is 757-269-7084
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 77438230# (remember the "#"). Phone connection only upon request.
Contents
Items for followup from previous meeting
- Testing goals and setup (Serguei) - addressed in agenda below
- Will to find out if there is any feedback from USM on terms and conditions from our procurement package.
- Collect this information of testing on the wiki for ease of presenting information. (USM)
Documents to Review
Tentative Agenda
- Announcements
- Review of Action Items
- Update - USM
- Status of MOU
- Simulation runs
- Cosmic-ray setup at UofR
- Light collection tests
- Geometry
- SiPM Radiation Hardness Test (Update from Yi)
- Light guides
Minutes
Attendees:Beni, Yi, Elton (JLab); Andrei (UofR); Alam (USM).
- Announcements
- Second shipment of Bcal modules delivered to JLab. They have been unloaded onto the parking lot. They will be transfered to the warehouse on Warwick Blvd. this afternoon.
- Review of Action Items
- Update - USM
- Serguei and Will are on travel.
- Light guides shipped to Regina, should arrive next week.
- Simulation runs
- Irina will start simulation runs of energy deposition in module next week.
- Cosmic-ray setup at UofR
- Tests are underway. Data for one point collected, and a second point taking data. No analysis yet. Measurements are being affected by power outages.
- Goal is to have data at five points along the module to determine the conversion Mev/p.e. and attenuation length in the actual calorimeter module (not just bare fibers).
- Expect results in August.
- Geometry
- SiPM Radiation Hardness Test (Update from Yi)
- SiPM samples (1mm2 and 3mm2) are ready for testing, but awaiting Carl to return next week. They will then be irradiated using the calibrated AmBe source from RadCon, and retested.
- Estimates for dark current to increase by a factor of 10 using new dose calculations by Pavel Degtiarenko from Radcon, are 1.2-1.6 years for H and 0.8-1.0 years for He at 100% running. For a "typical" year of 10^7 s, this translates into about 4 years for H and about 3 years for He.
- We will plan to have a dedicated meeting the week of July 12 to review all relevant input to deciding to proceed with the SiPM procurement.
- Light guides