(Action Items from previous meetings)
(Action Items from previous meetings)
Line 2: Line 2:
  
 
# Develop front and back views of jumper sheets.  (Jack)
 
# Develop front and back views of jumper sheets.  (Jack)
# <strike> Check into AC units based on Peltier coolers for SiPM production tests (Fernando) </strike> See  
+
# <strike> Check into AC units based on Peltier coolers for SiPM production tests (Fernando) </strike> See   [http://www.tripplite.com/en/products/model.cfm?txtSeriesID=759&txtModelID=4462 SRCOOL12K] and [http://rackmountsolutions.net/movincool-portable-air-conditioners.asp MovinCool]
# * [http://www.tripplite.com/en/products/model.cfm?txtSeriesID=759&txtModelID=4462 SRCOOL12K] and [http://rackmountsolutions.net/movincool-portable-air-conditioners.asp MovinCool]
+
 
# <strike> Review Fcal LED and controller monitoring boards (Fernando) </strike>
 
# <strike> Review Fcal LED and controller monitoring boards (Fernando) </strike>
 
# <strike> Decide on size of overlap of voltage bins for the SiPMs (Yi and Jack) </strike>
 
# <strike> Decide on size of overlap of voltage bins for the SiPMs (Yi and Jack) </strike>

Revision as of 17:15, 26 July 2012

Action Items from previous meetings

  1. Develop front and back views of jumper sheets. (Jack)
  2. Check into AC units based on Peltier coolers for SiPM production tests (Fernando) See SRCOOL12K and MovinCool
  3. Review Fcal LED and controller monitoring boards (Fernando)
  4. Decide on size of overlap of voltage bins for the SiPMs (Yi and Jack)
  5. Complete molds for wrapping and order forms (Jim) Elton to test wrapping forms.
  6. Thermal mats need to be ordered (Jim said that Fernando or Chris will take care of this)
  7. Cooling tubes need to be brazed in (Jim?) Bending and brazing tubes in progress
  8. Circuit board and micro-Dsub connector for monitoring system needs to be completed (Chris and Jim)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM production testing (everyone)
    • SiPMs assignment for new boards
  5. Mechanical assembly (Jim)
  6. Temperature compensation (Jack)
  7. Electronic boards (Chris)
  8. Light guide gluing setup

Minutes

Attending: Elton, Fernando, Yi, Chris, Nick, Scot

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
    • Light guide schedule: Two sets are promised for shipping tomorrow. Once in production, USM expects to be able to produce many sets per week.
  4. SiPM production testing (everyone)
    • SiPMs assignment for new boards
  5. Mechanical assembly (Jim)
  6. Temperature compensation (Jack)
  7. Electronic boards (Chris)
  8. Light guide gluing setup